Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
Level
- Ground Floor
- Level 1
- Level 2
- Level 3
- Level 4
- Level 5
- Level 6
- Level 7
- Level 8
- Level 9
- Level 10
- Level 11
- Level 12
- Level 13
- Level 14
-
Elevation/Section
Brick Slip Brackets
-
Has the correct type of brackets being used?
-
Have the penetrations in window sealant done at a minimum of 50mm from the window brackets?
-
Has the concrete been being drilled the correct diameter and depth?
-
Has the correct drawings/grid lines being used?
-
Has the correct fixings being used to install the brackets?
-
Are the brackets installed as per the approved design?
Sign Off
-
Jessella
-
Client