Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
Level
- Ground Floor
- Level 1
- Level 2
- Level 3
- Level 4
- Level 5
- Level 6
- Level 7
- Level 8
- Level 9
- Level 10
- Level 11
- Level 12
- Level 13
- Level 14
-
Elevation/Section
Brick Slip Brackets
-
Have the correct support been installed as per design?
-
Have the brackets been installed as per design?(300mm centers)
-
Have all additional angles been installed as per design?
-
Have the EPDM membrane and insulation been installed?
Sign Off
-
Jessella
-
Client