Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
Level
- Ground Floor
- Level 1
- Level 2
- Level 3
- Level 4
- Level 5
- Level 6
- Level 7
- Level 8
- Level 9
- Level 10
- Level 11
- Level 12
- Level 13
- Level 14
-
Elevation/Section
Brick Slips
-
Have all pre closeup inspections been carried out by Jessella & BYUK ?
-
Have all Horizontal rails being installed as per design?
-
Have the Horizontal rails being installed with the correct<br>spacing between mid rails and from starter/top rail?
-
Has the Siderise Intumescent Strip being installed where<br>necessary?
-
Have the correct colour bricks been used in this area?
-
Have the brick slip tiles been installed following manufacturers guidelines, following the required pattern and design?
-
Have the reveals been built as per design?
-
Are all aluminium bricks in the correct positions (lights, RWP)?
-
Are movement joints in the correct location and width of joints 10mm ?
-
Are bed / perpend joints uniform and within NHBC tolerances ?
-
Is the area clear of any significant cracks, chips and marks ?
-
Has a Side Rise intumescent sealant been added in the brick slip extrusion profile niche? (Brick slips in front of Cavity Barriers only!)
Sign Off
-
Jessella
-
Client