Title Page

  • Project

  • Date of inspection

  • Level

  • MAST Interiors Site Manager Signature

  • Date

  • Main contractor Site Manager Signature

  • Date

Quality Check

Boarding and Membrane

  • Close up walls ensuring the correct boards have been used as identified in the scope of works.

  • Visual inspection & recorded in the QA

  • The correct screws are used and at the designed centres

  • Visual & Dimensional checks carried out and photographic records in the QA

  • Mastic are installed correctly in line with the Specification

  • Visual inspection & recorded in the QA

  • ME315 Tape concrete to board are installed correctly in line with the Specification

  • Visual inspection & recorded in the QA

  • Tyvek housewrap / Vapor barriers installed correctly with the correct size overlaps and seals

  • Visual inspection & recorded in the QA

  • Tyvek acrylic tape are installed correctly in line with the Specification

  • Visual inspection & recorded in the QA

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.