Quality Check
Boarding and Membrane
-
Close up walls ensuring the correct boards have been used as identified in the scope of works.
-
Visual inspection & recorded in the QA
-
The correct screws are used and at the designed centres
-
Visual & Dimensional checks carried out and photographic records in the QA
-
Mastic are installed correctly in line with the Specification
-
Visual inspection & recorded in the QA
-
ME315 Tape concrete to board are installed correctly in line with the Specification
-
Visual inspection & recorded in the QA
-
Tyvek housewrap / Vapor barriers installed correctly with the correct size overlaps and seals
-
Visual inspection & recorded in the QA
-
Tyvek acrylic tape are installed correctly in line with the Specification
-
Visual inspection & recorded in the QA