Title Page
-
Project
-
Date of inspection
-
Level
-
-
-
-
-
-
-
-
-
MAST Interiors Site Manager Signature
-
Date
-
-
Main contractor Site Manager Signature
-
Date
Quality Check
StudWork
-
The latest Drawings & Specification have been used
-
Visual inspection of the design information & Recorded in the QA
-
SFS metal setting out checked and correct
-
Visual & Dimensional checks carried out and recorded in the QA
-
Stud deflection detail installed correct and checked
-
Visual & Dimensional checks carried out and recorded in the QA
-
Deflection head screws detail & deflection head screw position checked and correct
-
Visual inspection & recorded in the QA
-
Window boxed stud deflection detail checked and correct
-
Visual & Dimensional checks carried out and recorded in the QA
-
Lintel detail, Insulation in boxing checked
-
Visual inspection & recorded in the QA
-
Fixings to concrete checked and correct
-
Visual inspection & recorded in the QA
-
BG party wall detail formed correct
-
Visual inspection & recorded in the QA
-
Vent detail, letter box formed correct
-
Visual & Dimensional checks carried out and photographic records in the QA