Title Page
-
Project
-
Date of inspection
-
Block/Level/Plot No.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
MAST Interiors Site Manager Signature
-
Date
-
-
Main contractor Site Manager Signature
-
Date
Quality Check
Drywall 1st Fix
-
The latest Drawings & Specification have been used
-
Visual inspection of the design information, provided drawing number & Recorded in the QA
-
Setting out checked and confirmed as correct
-
Visual & Dimensional checks carried out and recorded in the QA
-
Studs installed are plumb and fixed correctly in line with the project specification
-
Visual & Dimensional, @600mm, bathrooms/kitchens @400mm centers, checks carried out and photographic records provided in the QA
-
Deflection head detail installed in line with the project specification
-
Visual & Manufacturer specification check and photographic records provided in the QA
-
Correct type of plasterboard have been used as per project specification
-
Visual inspection & recorded in the QA
-
Party wall to External wall detail installed correct with mastic in line with the project drawings and specification
-
Visual inspections & photographic records provided in the QA
-
All Mastic (fire/acoustic) details are installed correctly in line with the project specification
-
Visual inspection & recorded in the QA
-
All corners checked and square
-
Visual inspection & recorded in the QA
-
All openings such as door and letter boxes have been formed correctly
-
Dimensional checks in line with the latest design information & recorded in the QA
-
All Noggins have been installed as per latest drawings and project specification
-
Visual inspection & photographic records provided in the QA
-
Install all screed and head strips as agreed on site
-
Visual inspection & recorded in the QA
-
Plot cleared of all access materials & waste ready for hand over
-
Visual inspection & photographic records provided in the QA