Title Page

  • Project

  • Date of inspection

  • Block/Level/Plot No.

  • MAST Interiors Site Manager Signature

  • Date

  • Main contractor Site Manager Signature

  • Date

Quality Check

Partitions 1st Fix

  • The latest Drawings & Specification have been used

  • Visual inspection of the design information, provided drawing number & Recorded in the QA

  • Setting out checked and confirmed as correct

  • Visual & Dimensional checks carried out of HIU, kitchens, bathrooms, vanities and recorded in the QA

  • Sound Coat to Party walls as per project specification

  • Visual inspection and photographic records provided in the QA

  • External wall lining fixed correctly as per project specification

  • Visual inspection and photographic records provided in the QA

  • Studs with head and floor track installed are plumb, parallel and fixed correctly with bead of mastic in line with the project specification

  • Visual & Dimensional, @600mm, bathrooms/kitchens @400mm centers, checks carried out and photographic records provided in the QA

  • Deflection head along with flat plate detail installed in line with the project specification

  • Visual & Manufacturer specification check and photographic records provided in the QA

  • Correct type of plasterboard have been used as per project specification

  • Visual inspection and photographic records provided in the QA

  • Correct spacing to fixings been installed as per project specification

  • Visual inspection and photographic records provided in the QA

  • All Mastic to the penetrations (fire/acoustic) details are installed correctly in line with the project specification

  • Visual inspection and photographic records provided in the QA

  • Junction details to the project specification

  • Visual inspection and photographic records provided in the QA

  • All openings such as door and letter boxes have been formed correctly

  • Dimensional checks in line with the latest design information & recorded in the QA

  • All Noggins have been installed as per latest drawings and project specification

  • Bathrooms, Kitchens, Radiators, etc.Visual inspection & photographic records provided in the QA

  • Install all screed and head strips as agreed on site

  • Visual inspection & recorded in the QA

  • Plot cleared of all access materials & waste ready for hand over

  • Visual inspection & photographic records provided in the QA

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.