Title Page
-
QA 1st fix Grid and Service Tile
-
Site
-
Select date
Drywall 1st Fix
-
Room Number
-
Wall Specification correct s per project pack
-
Deflection head installed and provides correct allowance
-
Fixings at required centres and flat plate installed
-
All structural openings formed to correct size and specification. Timber within door jamb stud (Refer to door and glazed screen schedule)
-
All buildersworks formed as per drawings
-
Area left clean and tidy
-
Images
-
Comments