Title Page
Audit Scope
-
Site Quality Audit
Audit Scope - ISO9001:2015, ISO14001:2015, Clipfine Ltd. company policies and procedures.
Project Details
-
Project Name
-
Job Number
-
Date/Time
-
Site Manager/Supervisor:
-
Operation Manager
-
QS
-
SHEQ Advisor
-
Auditor
Monitoring Programme
-
Site Quality Audit
Audit Scope - ISO9001:2015, ISO14001:2015, Clipfine Ltd. company policies and procedures.
Monitoring Programme
-
QAE Audits
-
Date and Time
Last SHE Inspection
-
Date and Time
Last Logistics Managers Weekly Inspection Inspection
-
Date and Time
Last Security Managers Inspection
-
Date and Time
Last Senior Manager Tour
-
Date and Time
Quality Systems
-
All issues from previous audit are closed out
-
Project Contract / Scope of works agreed and in place and available
-
Pre Start Meeting Minutes available
-
Project Exucution Plan (PEP) in place and kept up to date
-
Contract programme available and up-to-date
-
Security Assignment Instruction (AI) in place and up-to-date
-
Project Quality Plan issued and updated
-
Clipfine filing system compliant
-
All documents used with the company are controlled documents to current revision
-
All hard copies with personal data are locked away (Induction record, Medical Questioner, Accident/Incident form)
-
Site Training Matrix compiled and updated, training requirements identified, due to be expired training certification highlighted
-
Weekly meetings with the client minuted
-
Delivery performances captured and issued to the client.
-
Complains are recorded and actioned
-
Customer Feedback recorded and reported to Head Office
IT
-
Internet set up and access to e-mail and Clipfine online systems?
-
Hardware adequate and in good working order? (Computer, Laptop, Printer, Phones, etc)
-
What Clipfine Applications are in place?
-
Are staff trained on the Clipfine IT Systems?
Commercial & Procurement
-
All operatives are recorded on a time sheet and signed off by client and site manager
-
All works outside the agreed scope of works are instructed by the client (Variations)
-
Purchase orders are raised without an identified scope item / formal client instruction
-
Copies of Purchase Orders (POs) being produced and sent to Head Office weekly
-
Only approved Suppliers/Contractors are used (see approved database)
-
Material Procurement Schedule available
-
Schedule of hired equipment available
-
Delivery notes are filed and any defects/discrepancies are recorded
-
Materials received being checked, stored and protected
Plant & Equipment
-
Plant and lifting equipment register is up-to-date with all relevant in-date Thorough Examination certificates filed
-
Plant check sheets compiled, defect recorded, reported and closed out
-
Unsuitable materials, plant, equipment or tools marked, compounded or removed to prevent use No (Quarantined)
-
Lift Plan signed by an Appointed Person (AP)
-
Schedule of common lifts clearly identifying reach load’s dimensions, weight, centre of gravity, No slinging and lifting method, lifting accessories to be used, picture or sketch showing the above
Environmental Procedures
-
What are the Environmental Sustainability KPIs for Clipfine on this Project?
-
Are we meeting the KIPs?
-
Environmental Aspect and Impacts recorded (Dust, Noise, Vibration, Discharge, Waste, etc)
-
Waste Management Strategy agreed
-
Installation of bin signage / waste segregation
-
Monthly Environmental reports are compiled and issued to the client
-
Arrangement for Hazardous waste removal set up
-
Waste Transfer Notes (WTN) / Consignment Notes are readily available for each waste transfer
-
Emergency Spill procedures in place with adequate spill kits in key locations
-
Are Monthly Environmental Tool Box Talks carried out? If so, what was the the last Tool Box Talk No on?
-
COSHH Storage adequate and in suitable location
Temporary Works
-
Installations carried out with Clipfine activites fall under Temporary Works requirements BS 5975.
-
Temporary Works File compiled and register up-to-date
-
Temporary Works Coordinator (TWC) and Temporary Works Supervisor (TWS) are appointed by No the company Designated Individual (DI)
-
All temporary works installations are as per design
-
Has Clipfine received the TW design form the client?
-
Appointed Temporary Works Supervisor (TWS) carries out weekly inspection records
-
Permits to load / strike are issued
Branding / Cooperate identity
-
All Clipfine Ltd. Operatives are wearing the Clipfine PPE
-
All Security Officers are alert in adequate uniform (front of house appearance)
-
All Clipfine Logos are displayed as per the company branding document
-
Site signage is adequate, clean and in good shape
-
Clipfine out-of-hours Control Room number displayed
Sign Off
-
Please note:
Any questions answered with N/A are not applicable under the agreed scope of works or instruction issued to Clipfine Ltd. although it may be relevant to others.
All questions answered with ‘YES’ are relevant to the site and are compliant.
All questions answered with ‘NO’ are relevant and are not compliant. In this instance, an action requirement and closeout action period are issued to the appropriate individual via EasyBOP when this report is published. This action requirement is also recorded and tracked against your project in the company Business Improvement Log. Closeout periods will differ in relation to the severity of the circumstances. -
Site Manager Signature
-
Auditor Signature