Pre-quote Assessment
Requested Scope
-
Area for Works
Area
-
Name the area: (I.e. downstairs bathroom, building 1)
-
What is being requested?
- Asbestos Removal
- Demolition
- Asbestos Management Plan
- Re-instatement
- Project Management
-
What type of Asbestos removal is needed?
- Ceiling
- Cladding
- Fence
- Flooring
- Guttering
- Pipes
- Soffits
- Roof
- Switchboard
- Walls
- Other
-
What other asbestos is to be removed?
-
Does the roof contain Cool 'n' Cosy Insulation that requires removing?
-
Does the removal need to occur under "A Class - Friable" conditions?
-
Client specific requests
-
Photos of site
-
Site drawings
Drawing
-
Site drawing
-
Measurements and Notes
Job requirements
-
Will removal crew require special details for site access?
-
Provide required information
-
Provide Photos of site access
-
Are there any obstacles to performing the job (i.e furniture)?
-
What needs to be moved/worked around?
-
Photos of the obstacle.
-
Are there any protective coverings for special surfaces?
-
What needs to be covered?
-
Are any subcontractors required?
- No
- Builder/Carpenter
- Roofer
- Flooring
- Data/IT
- Plumbing
- Other
- Electrician
-
What other subcontractors?
-
Are any special tickets required by the workers?
- No
- Heights
- Confined Spaces
- Dogging
- Rigging
- Safety Net Installer
- EWP
- Heavy Rigid
- Other
-
What other tickets are required?
-
Is there any Hire equipment Required?
- No
- Crane
- Scissor lift
- Knuckle Boom
- Edge Protection
- Other
-
What other equipment will need to be hired?
-
Do we need to co-ordinate with any other Trades not engaged by QAMS?
-
Is there any Hire equipment Required?
- No
- Crane
- Scissor lift
- Knuckle Boom
- Edge Protection
- Other
-
What other equipment will need to be hired?
-
Do we need to co-ordinate with any other Trades not engaged by QAMS?
-
Is there any time requirements or restrictions for completing the job?
-
When does the client want the job done?
-
Is a Hygienist required?
-
Who is to complete sign-off?
Specialist Equipment Reqirements
-
Do we require any equipment to be hired ready for this job?
-
List all equipment required to be hired
-
Do we require any "In-House" equipment to be ready for this job? (Tarps / Jack Hammers / Etc.)
-
List all equipment required to be made ready