Information
-
Document No.
-
Audit Title
-
Inspection Date
-
Auditor
-
CNG Inspector
-
Contractor
- Corning Natural Gas
- EE Root
- Deery
- KBH
- DDS
- Sullivan Trail
- PLE
-
Location
Audit Information
-
Corning Natural Gas
QA/QC Inspection Checklist -
To be completed by Safety, Engineering, or Operations Supervisor or Project Inspector weekly from the start of construction work on site.
-
Project Title:
-
Work Order #:
General Safety
-
General Safety
-
S = Satisfactory, U = Unsatisfactory, O = Observation, NA = Not Applicable
-
Is work being done in the vacinity of traffic?
-
Have Traffic flow controls been implemented correctly?
-
Is a flag person utilized when required?
-
Is a flag person using proper equipment?
-
Have pedestrian traffic flow controls been implemented?
-
Is a combustible gas indicator availble on site?
-
Is the combustible gas indicator calibrated?
Job Site Preparation
-
Job Site Preparation
-
Is the Corning Natural Gas O&M available on site? Are all operatives aware of it?
-
Are all operatives OQ qualified to perform the task? (Check ID cards)
-
Are the lavatory facilities adequate and is there appropriate first aid provision on site?
-
Is the site tidy and free from trip hazards and is there safe access and egress available for all?
-
Have all overhead and underground services been identified and marked?<br><br>Are the markings clearly visible?
-
Is project bid document and design drawings on site?
-
Is installation being completed according to the project bid documents and design drawings?
-
Is crew aware of operating and relief setpoint pressures?
-
Is permit on site?
-
Is pipe being handled correctly?
-
Is pipe print line being recorded on inspection log?
-
Scan Pipe print line
PPE
-
PPE
-
Is hard hat worn as required?
-
Is safety eyeware worn as required?
-
Has hearing protection been worn as required?
-
Is safety footwear worn as required?
-
Is FR outerwear worn as required?
-
Is Hi-Viz worn as required?
-
Is respirator worn as required?
-
Is safety gloves worn as required?
Vehicle Safety
-
Vehicle Safety
-
Is vehicle operation being witnessed?
-
Is seat belts/harness being worn for the safe operation of all vehicles?
-
Is backup assistance provided when backing up equipment or vehicles?
-
Is cargo secured safetly?
-
Are operational emergency lights being used as required?
-
Is the crew using approved fuel can?
-
Are wheel chocks being used?
-
Is first aid kit available?
-
Is fire extinguisher available?
Fusion/Joining
-
Fusion/Joining
-
Is Plastic Fusion being performed?
-
Is power generator output sufficient for activity being performed?
-
Is equipment in good conditions?
-
Has the equipment passed an active inspection ?
-
Are proper clamp allignment tools in use?
-
Are proper fusion/joining proedures followed?
-
Is pyrometer utilized?
-
Is a visual inspection being completed on the completed fusion/joining?
-
Was mechanical fittings installed properly?
-
Are stab/reference marks accurate?
Safety - Excavations
-
Safety - Excavations
-
Is an open excavation present?
-
Is the excavations safely supposed if required?
-
Is the excavation properly barricaded?
-
Is the access and egress for excavation safely maintained?
-
Is an excavation currenly being worked on?
-
Were all underground facilities within the tolerance zone exposed by hand implement tooling prior to utilization of powered/mechanized equipment?
-
Is spoil setback maintained as required?
-
Is the operator aware of any above ground facilities hazards in the work space?
Service
-
Service
-
Is service pipe being installed?
-
Is proper protection being provided for shear points and casing ends?
-
Was the service installed with minimum cover requirements met?
-
Is the service riser valve installed to be accessible and operable?
-
Was there proper seperations between above-grade gas and other facilities or structures?
-
Was system operating pressure verified during service installation?
-
Is the regulator vent installed correctly?
-
Is EFV installed correctly?
Mains
-
Mains
-
Is main being installed?
-
Was main installed with minimum cover requirements met?
-
Was main installed by CNG approved method?
-
Was the old main properly retired?
-
Was the gas main valve box installed correctly?
Meter Installation
-
Meter Installation
-
Is/has a meter been installed?
-
Has the meter been properly supported?
-
Was the meter installed plumb and square?
-
Was the meter piping and fittings propertly coated?
-
Were protectection posts installed at hazardous meter locations?
-
Is a meter currently being tested after installation?
-
Is the dial test performed per CNG procedure?
-
Was the purge procedure followed?
-
Was CNG relighting customer procedure followed?
-
Was a check for gas leakage performed?
Pressure Test
-
Pressure test
-
Has a pressure test been completed?
-
Was pressure testing procedure followed?
-
Was the pressure test documented on all appropraite forms?
Backfill/Restoration
-
Backfill and Restoration
-
Is suitable backfill material being used?
-
Is the pipe gettting installed with 6" of sand on all sides?
-
Is pavement restoration started?
-
Does pavement conform with permit requirements?
-
Is the compaction process correctly performed?
-
Has restoration started?
-
Is the site stabilized?
-
Has seed and mulch been applied to disturbed areas?
-
Is water drainage returned to pre-construction routes?
-
Is the condition of worksite left clean?
Asset Integrity
-
Asset Integrity
-
Was buried warning tape installed as required?
-
Has coating been installed correclty?
-
Was cathodic protection installed as required?
-
Type of installation?
-
Is tracer wire installed as required?
-
Was continuity test performed on tracer wire?
-
Has coating been inspected(jeeped)?
Signature
-
Auditor's Signature
-
CNG Inspectors Signature
-
Date