Title Page
-
IHS Site ID
-
Installation Date
-
Installed By
-
QC Conducted on
Checklist
-
Has the gate been aligned?<br><br>(Ensure main gate sliding bolt can enter fully into adjacent slot and moves freely)<br>(If N/A then provide a reason)<br><br>Video 1 of 5
-
Is the lock installed level?<br><br>(Ensure all casings are level and no gaps are visible between spirit level and casing)
-
Is the gap between the two casings between 5mm to 9mm apart?<br><br>(Add a photo and the actual measurement typed out)
-
What is the measurement between the 2 casings
-
Is the welding neat and has fusion been made between metal’s?
-
Has the heat affected zone been cleaned and treated?<br><br>(Area affected by the heat of the welding, 5cm above and under the welded area)
-
Have all sheer off nuts been sheered off?
-
Have the bolts been flush cut with the sheer off nuts and tack welded on the<br>ends?
-
Has the lock been installed at the correct orientation in the casing?<br><br>(Ensure the LED's are visible through the two slots on the casing)<br><br>Video 2 of 5
-
When you push the button on the back of the lock, do the lights come on?<br><br>(This will change to include lock and unlock)<br><br>Video 3 of 5
-
Does the shackle enter the lock relatively freely?<br><br>Video 4 of 5
-
Have all welding rod ends , sheer off nut heads and other debris been removed from site? <br><br>(Take photos of site and all collected debris)
-
Did the installation pass? <br><br>Video 5 of 5<br><br>(If no, give a reason)
-
Any additional information?
-
Is the site locked and secure?<br><br>(Attach screenshot of the WorkWide confirmation that the site is locked)
-
Remove, label (with Site ID), and return old lock to the Neocom Office