Title Page
-
Checked By
-
QC Conducted on
-
NCS team to move Transnet batteries into temporary position
-
Provide readings of batteries & labels in temporary position
-
Is the base plinth in correct position & chemical anchored into ground ?
-
Has the AC electrical preparation work been completed ?
-
Has the existing door & door frame been removed to place in battery safe ?
-
Has the battery safe been transported safely to site via crane truck ?
-
Did battery safe arrive to site dismantled in order to fit through door ?
-
Has the battery safe been offloaded safely & correctly by crane truck ?
-
After offloading has the battery safe been damaged or defaced in any way ?
-
Has battery safe been placed correctly onto base plinth ?
-
Has TPS been poured correctly on site ?
-
How many TPS kits has been used on site ?
-
Has all the TPS debris been removed from site ?
-
Has the roof been installed correctly into position ?
-
Has the inside of cabinet been touched up by paint ?
-
Has the battery racks been installed in correct position after paint touch ups ?
-
Has all the electrical work required by battery safe been completed ?
-
Has the batteries been tested after being placed inside battery safe to there correct positions ?
-
Has tests been conducted off smartlock ? Please attach prism report.
-
Has the paint touch ups been completed on the outside of battery safe ?
-
Has NCS serial number & RFD tag been placed on battery safe ?
-
Please provide overall video of battery safe after installation
-
Has the cabinet been earthed ?