Framing
-
Quality material is being used.
-
Attic openings are double framed and supported with joist hangers.
-
Cabinet blocking has been installed in baths and kitchens.
-
1/2 walls are complete and braced.
-
Hangars are nailed and installed per manufacturers specs.
-
Exterior sole plates are secured.
-
All anchor bolts should have washers and nuts.
-
All bowed studs are repaired or replaced. No stud shall bow more than 3/16 in 32".
-
All window reveals are shimmed to equal distances.
-
HVAC platform and walkway are to code. 24" wide walkway and 30" by 30" service platform in front of the unit.
-
Ensure that the water heater platform is code compliant if water heater platform exists.
Cornice
-
Quality material is being used.
-
All sheathing is nailed per structural engineer's plans.
-
There are no gaps or holes in sheathing and all vertical runs have been taped.
Electrical Rough
-
Quality material is being used.
-
Locations of switches, plugs, fixtures and appliance rough in's all agree with plans and there are no switches behind doors.
-
Outlets are installed under the sink with an outlet closest to dishwasher.
-
Nail guards are installed where wiring is within 1/4" from the edge of framing members.
Plumbing Rough
-
Quality material is being used.
-
Drain lines have been tested at clean out.
Drywall
-
Quality material is being used.
-
All plugs, outlets, vents are cut out and wires are undamaged.
Tape and Bed
-
Excess mud is cleaned from top of tubs.
Interior Trim
-
Quality material is being used.
-
Door swings are per plan.
-
Doors are installed level and plumb.
-
Doors close flush against the stop.
-
Doors are set with a 3/16 between a door and jamb.
-
All hinge pins are set.
-
Row of 1/4" round in all vinyl flooring areas has been installed.
-
Doors have been readjusted to ensure doors close tightly.
-
Weather stripping has been removed and placed in attic.
Cabinets
-
Quality material is being used.
-
All screws have been cut off that penetrate through the inside of the cabinet and the overhang of the countertop.
-
All shelf clips and shelves have been installed.
-
Counter overhang is supported with cabinet corbels.
Carpet
-
Quality material is being used.
-
Stairs are wrapped with no visible staples.
-
Doors are all reinstalled and door hinge pins are reset.
-
Strings are cut.
Vinyl
-
Quality material is being used.
-
Tub strips are installed and not damaged.
Countertops
-
Quality material is being used.
-
Bar overhang is 12" and supported with decorative corbels.
-
Tile is caulked to back splash and to edge material.
-
Bull nose tile is used at window corners and countertop edges.
Lockout
-
Shoe mold has been installed in vinyl areas.
-
Shelves and brackets are installed.
-
Towel bars, towel rings and toilet paper holder are installed per plan.
-
Weatherstrip is installed.
-
Door latch and lock smoothly.
-
Exterior doors have no gaps.
-
Door / hinge stops have been installed.
-
Door patches have been installed.
-
Bull dog clips have been installed.
-
Building numbers have been installed on the front and back.
Electrical Trim
-
Island fixtures are centered on island and cabinet doors do not hit.
-
Exterior waterproof plates are installed and sealed with clear silicone caulk.
-
Exterior fixture gaskets are installed and sealed.
Mechanical Trim
-
All escutcheons are installed and caulked.
-
Condensation pan, primary and secondary drain lines have been water tested for leaks prior to start up.
Mechanical Start Up
-
Air flows at all registers.
Plumbing Trim
-
All fixtures are installed correctly with no leaks.
-
Faucet handle trim plates are caulked entirely around.
-
Tub faucet is caulked at tub wall.
-
All fixtures have proper water pressure.
-
Kitchen sink is caulked at tile.
-
Disposal and plug are installed and function properly.
-
Chained, inflatable test ball has been removed from clean out and clean out cap has been spray painted green.
Interior Paint
-
All casing, base, crown molding and shoe mold is caulked to walls and floors.
-
Bottom of window stool and handrail are caulked and painted.<br>
-
Weather stripping that was in the attic is now installed in the exterior doors.
-
Tape is removed from hinges and ball joints and excess paint is cleaned.
Final
-
Quality material has been used.
-
All exterior penetrations are caulked as well as light fixtures and plumbing cleanouts.
-
Hardware and hinges have no paint on them.