Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
HV REMEDIAL MAINTENANCE REPORT
INSPECTION DETAILS
-
DATE OF INSPECTION
-
NAME OF PERSON CONDUCTING MAINTENANCE
-
NAME OF FACILITY
-
LOCATION OF MAINTENANCE - ROOM NUMBER
SCOPE SUMMARY
-
CHECKED AND ADJUSTED DAMPERS IN Tx PROTECTION CB
-
CLEANED AND REMOVED ALL OLD GREASE FROM MOVING PARTS IN THE ISOLATORS, EARTH SWITCHES AND PROTECTION CIRCUIT BREAKER. REGREASED ALL MOVING MECHANICAL PARTS
-
CHECKED AND CLEANED ALL LV AND HV TERMINATIONS IN THE RMU AND Tx.
-
INSTALLED EARTH COLOUR CODING ON THE DRAINS AND SHIELDS OF THE HV CABLES AT THE RMU END
-
VACUUMED AND WIPED CLEAN ALL CUBICLES OF DUST AND REINSTATED COVERS
-
NEW TEMPERATURE CONTROLLER AND PT100 THERMISTORS INSTALLED AND COMMISSIONED.
FORWARD SWITCHING
-
RECORD LOW VOLTAGE CHANGEOVER TIME
-
WERE THERE ANY ABNORMALITIES WITH THE FORWARD HV SWITCHING?
-
PLEASE PROVIDE MORE DETAIL
MAINTENANCE TASKS
RMU ISOLATORS AND EARTH SWITCHES
-
RMU ISOLATOR
-
WHAT IS THE ISOLATOR DESIGNATION?
-
REMOVE ANY OLD GREASE
-
CONFIRM ALL ACCESSIBLE FASTENERS ARE FIRMLY TIGHTENED
-
GREASE MOVING PARTS/AREAS OF FRICTION WITH LITHIUM GREASE
-
CHECK ELECTRICAL CONNECTIONS (PLUGS/TERMINATIONS ETC)
-
INSPECT ALL CABLES/ELECTRICAL CONNECTORS FOR MECHANICAL DAMAGE.
-
IS THERE A SPRING CHARGE MOTOR
SPRING CHARGE MOTOR
SPRING CHARGE MOTOR
-
VERIFY SPRING CHARGE MOTOR IS OPERATIONAL AND MOVES FREELY - MANUALLY CHARGE SPRING, OPERATE AND CHECK FOR RESISTANCE OF MOVEMENT
-
MANUALLY OPERATE USING BREAK ARM AND CHECK FOR RESISTANCE TO MOVEMENT.
-
CHECK FUNCTION OF LIMIT SWITCHES AND VERIFY CONDITION
-
WERE THERE ANY ABNORMALITIES IDENTIFIED WHILST SERVICING THIS ISOLATOR?
-
PROVIDE FURTHER DETAILS
-
PROVIDE PHOTOS
RMU EARTH SWITCH
-
WHAT IS THE EARTH SWITCH DESIGNATION?
-
REMOVE ANY OLD GREASE
-
CONFIRM ALL ACCESSIBLE FASTENERS ARE FIRMLY TIGHTENED
-
GREASE MOVING PARTS/AREAS OF FRICTION WITH LITHIUM GREASE
-
INSPECT ALL CABLES/ELECTRICAL CONNECTORS FOR MECHANICAL DAMAGE.
-
CONFIRM EASE OF MOVEMENT OF ALL MECHANICAL PARTS. MANUALLY CLOSE AND OPEN HV EARTH SWITCHES UNDER AP TO CONFIRM MECHANICAL EASE.
-
WERE THERE ANY ABNORMALITIES IDENTIFIED WHILST SERVICING THIS EARTH SWITCH?
-
PROVIDE FURTHER DETAILS
-
PROVIDE PHOTOS
TRANSFORMER PROTECTION CIRCUIT BREAKER
-
WHAT IS THE CIRCUIT BREAKER DESIGNATION?
-
REMOVE ANY OLD GREASE
-
CONFIRM ALL ACCESSIBLE FASTENERS ARE FIRMLY TIGHTENED
-
GREASE MOVING PARTS/AREAS OF FRICTION WITH LITHIUM GREASE
-
CHECK ELECTRICAL CONNECTIONS (PLUGS/TERMINATIONS ETC)
-
INSPECT ALL CABLES/ELECTRICAL CONNECTORS FOR MECHANICAL DAMAGE.
-
INSPECT ALL PARTS FOR SIGNS OF UNUSUAL OR EXCESSIVE WEAR
-
CHECK DAMPER IS CORRECTLY POSITIONED AND SECURED IN PLACE, CLEANED AND GREASED.
-
RECORD CYCLE COUNTER
SPRING CHARGE MOTOR
-
VERIFY SPRING CHARGE MOTOR IS OPERATIONAL AND MOVES FREELY - MANUALLY CHARGE SPRING, OPERATE AND CHECK FOR RESISTANCE OF MOVEMENT
-
MANUALLY OPERATE USING BREAK ARM AND CHECK FOR RESISTANCE TO MOVEMENT.
-
CHECK FUNCTION OF LIMIT SWITCHES AND VERIFY CONDITION
-
WERE THERE ANY ABNORMALITIES IDENTIFIED WHILST SERVICING THIS PROTECTION CIRCUIT BREAKER?
-
PROVIDE FURTHER DETAILS
-
PROVIDE PHOTOS
LV COMPARTMENT
-
VISUALLY INSPECT ALL TERMINATIONS AND CONFIRM THEY ARE TIGHT
-
CONFIRM THAT CONTROL CABINET HAS BEEN CLEANED. VACUUMED AND WIPED.
-
TAKE PHOTO OF SF6 GAS GAUGE
-
INSPECT ALL CABLES AND ELECTRICAL CONNECTORS FOR DAMAGE
-
WERE THERE ANY ABNORMALITIES IDENTIFIED WHILST SERVICING THIS PROTECTION CIRCUIT BREAKER?
-
PROVIDE FURTHER DETAILS
-
PROVIDE PHOTOS
CABLE ZONES
-
THOROUGHLY CLEAN - VACUUM AND WIPE
-
CONFIRM THE COLOUR CODING OF THE HV CABLES SCREENS (YELLOW/GREEN)
-
CONFIRM CABLE CLAMP TIGHTNESS
-
WERE THERE ANY ABNORMALITIES IDENTIFIED WHILST SERVICING THIS PROTECTION CIRCUIT BREAKER?
-
PROVIDE FURTHER DETAILS
-
PROVIDE PHOTOS
COMPLETED FULL TEST OF TEMPERATURE CONTROLLER AND THERMISTOR CHECK, INCLUDING CALIBRATION TO ENSURE THAT FANS, ALARM AND TRIP OCCUR WITHIN TOLERANCES OF AS/NZS 60076-2:2013. REPORT WILL SHOW THAT THE TEMPERATURE CONTROLLER TOLERANCE WAS WITHIN 1%.
-
CONFIRM FANS SWITCH ON AT 50 DEG C
-
CONFIRM THAT CONTROLLER ALARMS AT 60 DEG C
-
CONFIRM TRIP AT 100 DEG C
GENERAL CHECKS
-
TIGHTNESS CHECKS ON ALL Tx HV TERMINALS
-
TIGHTNESS CHECKS ON ALL Tx LV TERMINALS
-
VISUAL INSPECTION IN Tx CAGE ENSURING ALL MATERIALS AND EQUIPMENT REMOVED AND ACCOUNTED FOR
-
MEN CHECK - CONFIRM UPGRADE OF LV MEN TO PARALLEL 120 SQMM CABLES
-
THERMISTOR CHECK - CONFIRM UPGRADE OF THERMISTORS AND CHECK TIGHTNESS OF TERMINATIONS
-
TAKE PHOTO OF UPGRADED MEN
-
TAKE PHOTO SHOWING NEW THERMISTORS
CLEANED TRANSFORMER ROOM
-
HEPA VACUUMED ALL SURFACES WITHIN THE Tx CAGE AND ROOM
-
WIPED DOWN ALL SURFACES IN THE Tx CAGE AND OUTSIDE REMOVING ALL DUST
-
RELAMPED ALL THE LIGHT FITTINGS WITH IN THE ROOM
-
TAKE PHOTO SHOWING CLEANED ROOM
GENERAL COMMENTS
-
FURTHER INFORMATION
-
FURTHER INFORMATION
-
ADD FURTHER PHOTOS IF NEEDED
REVERSE SWITCHING
-
RECORD LOW VOLTAGE CHANGEOVER TIME
-
WERE THERE ANY ABNORMALITIES WITH THE REVERSE HV SWITCHING?
-
PLEASE PROVIDE MORE DETAIL
-
END OF AUDIT