Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Site inspection Checklist
-
Flooring
-
Wall tiling/boarding
-
Taps
-
Leaks
-
Bath/Basin Overflow
-
Earth Bonding Visable
-
Decorations
-
Silicone Seals
-
Bath Fixed Correctly
-
WC Fixed Correctly
-
Shower and Screen
-
Scale Inhibitor Fitted
-
Electrics
-
Skirting
-
Extractor Fan (Vectaire)
-
Cleanliness
Sign off
MD Group signature
-
I confirm I have inspected the property and all works are correct as per the specification and ready for handover
Tenant signature
-
I confirm that all work has been completed to my satisfaction.
SDC signature
-
I confirm I have signed off this property and any defects will be rectified within 7 days.