EWI Pre-Installation Building Inspection Form
-
Conducted on
-
Contract
-
Prepared by
External Wall Insulation Pre-Installation Building Inspection Form
Customer Information
-
Contact Name:
-
Address:
-
Telephone:
-
Email:
Project Details
-
Project Reference:
-
Specifier's Contact Details:
-
Product Type:
Following investigation and assessment, will the EWI installation work:
-
Result in non-compliance with the Building Regulations, e.g. in relation to workmanship; materials; structural ability; fire safety; resistance to moisture?
-
Result in the unsafe operation of combustion appliances?
-
Compromise the functionality of existing ventilation ducts/systems?
-
Compromise the functionality and/or safety of existing services? (gas, electric, water, telephone, etc.)
-
Will the proposed installation be non-compliant with any requirements stated by the supplier?
-
Is the type and condition of the building structure suitable for the works to commence?
-
What is the extent of the external surface area to be covered?
-
Will the site layout or conditions impair the execution of the works?
-
Have relevant checks have been undertaken to determine if asbestos containing materials are present?
-
The pre-installation building inspection shall be accompanied by evidence that the findings of the pre-installation building inspection have been independently checked by an appropriately qualified person (see B1-13) prior to commencement of installation, with at least a randomly selected 1 in 10 of those checks (minimum of 1) including physical inspection of the building by an appropriately qualified person. the appropriately qualified person shall: Be independent and not an employee of the inspector or of the Installer of the EWI, or a peer installer Not be paid by results nor remunerated only where an assessment is found to be valid Ensure that each inspection checked includes a unique identifier and the names of the persons who completed the inspection and the check.
General
-
Is there any potential for moisture build up as a result of the installation?
-
Will the functionality and/or safety of installed services (gas, electricity, water, telecommunications etc.) be affected in any way as a result of the installation?
-
Is there any potential risk in relation to the ongoing performance of installed services? (If YES liaison with measure specifiers and/or service providers will need to take place).
-
This Building Inspection must be carried out in conjunction with the full Design Specification and the prepared Method Statement.
-
From the findings of this building inspection, is the installation able to be carried out in line with the full Design Specification?
-
From the findings of this building inspection, is the Method Statement suitable and complete?
-
Is there any evidence that any form of protected species would be disturbed by the installation process?
-
NOTE: Any changes needing to be made or problems encountered as a result of this building inspection are required to be discussed with the Retrofit Coordinator, Designer and/or customer as appropriate and agreement reached on how to proceed before work commences.
Carbon Monoxide and other Safety Alarms
-
Where carbon monoxide (CO) or other safety alarms have already been installed at the designated location, the building inspector should enquire of the customer whether or not they have been tested in accordance with the alarm system design specification and/or the manufacturer's instructions.
-
Alarms Present?
-
Location:
-
Type of Alarm:
-
Test Result:
Does the customer understand the nature and extent of the work?
-
Does the customer understand the nature and extent of the work?
-
Have they been made aware of any disruption that may be caused
-
Does the customer have any particular requests or requirements?
-
Are the arrangements for site access and the storage of installation materials adequate and appropriate?
-
Is there any other information which would help ensure the smooth running of the installation process?
-
This building inspection and its findings, including those relating to the suitability and completeness of the installation method statement, the EEM specification and any customer-related issues, shall be made by the Assessor and retained by the Installer, with a copy being made available to the Retrofit Coordinator.
Customer Sign Off
-
By signing the below, you agree to the following statements:
• We have explained and you are aware of the nature and extent of the installation and this meets your expectations
• The arrangements we have made for site access and installation materials storage are adequate and appropriate for the installation to be undertaken
• The intended days and hours of working are acceptable -
Customer Signature:
-
Date:
-
Building inspection carried out by:
-
Signed:
-
Date:
-
Independent inspection carried out by:
-
Signed:
-
Date: