Information
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
CATEGORY 1
-
City Final Tag
-
Power On
-
Gas Meter Installed
-
HVAC Start up completed
-
Camera Drain Lines
-
Electric Hot Checked
-
Home Cleaned
-
Toilet Covers Installed
-
Booties Provided
-
Sticks in all windows
-
All Signage Posted
-
Garage Door Opener-Tested
-
Attic Insulation/Tag/Rulers
-
Grading & Drainage -Arrows
-
Condi-Pan/ Lines Have Proper Fall
-
Condi-Lines Connected at Vanities
-
No Plumbing Leaks- 30 Minute Test
-
Hot & Cold Lines Not Reversed
-
Structured Wiring Panel Complete
-
Heat Start Up (Gas Flex Connected)