Information
-
Client / Site
-
Client Site
-
Client Representative / Project Manager
-
Prepared by
-
Conducted on
-
Location
-
Document No.
Site conditions and work activity
Site Personnel & Competence
-
Is there a SMSTS Trained Site Forman on site?
-
Name
-
Is there a SSSTS Trained foreman on site?
-
Name
-
Is there a qualified First Aider on site?
-
Name
-
Is there a qualified Fire Warden on site?
-
Name
Work Activity
-
Give a brief description of the work activity on site
SubContractors
-
List of trades on site during inspection.
CONTRACTOR
-
Contractor name
-
Number of operatives on site
Programme
-
What week in the programme was the inspection carried out
Images
-
General images of site
Site H&S Audit
1.0 - Previous Inspections & Subsequent Actions
-
1.1 - Has there been a previous Site Safety inspection carried out by QSF or others?
-
1.2 - Are there any outstanding actions from previous reports?
2.0 - Documentation
-
2.1 - Is F10 displayed?
-
2.2 - Is the Construction Phase Health and Safety plan on site?
-
2.3 - Is a suitable asbestos survey available on site & all significant information communicated to all trades?
-
2.4 - Are QSF RAMS on site and signed by individual operatives carrying out tasks on site?
-
2.5 - Are "Point of Works" Risk Assessments completed for on-site tasks and signed by the individual operatives?
-
2.6 - Are Sub Contractor RAMS on site for all trades?
-
2.7 - Are all Sub-Contractor RAMS signed by their operatives prior to commencement of works?
-
2.8 - Are COSHH Assessments on site and relevant?
-
2.9 - Have inductions been completed and records upto date?
-
2.10 - Are Hot Works Permit's in place for any hot works & kept up to date?
-
2.11 - Is Permit To Work in place and up to date?
-
2.12 - Have Toolbox Talks been completed and signed by participants?
-
2.13 - Are daily and weekly site safety checks and inspections up to date and complete?
-
2.14 - Is accident book on site?
3.0 - H&S Station
-
3.1 - Is first aid kit on the H&S station?
-
3.2 - Is it well stocked with all first aid equipment relevant and in-date?
-
3.3 - Is correct PPE signage displayed and being enforced?
-
3.4 - Is the Signing in Folder located in an appropriate location and up to date?
-
3.5 - Is the QSF Employers Liability Insurance document displayed (Min £5m)?
-
3.6 - Is the current H&S Law poster displayed?
-
3.7 - Is QSF's signed Health and Safety Policy Statement clearly displayed?
4.0 - General Site Conditions
-
4.1 - Are the site entrances, exits, and walkways free from obstruction and kept clear?
-
4.2 - Is the site free from slips, trips and falls hazards?
-
4.3 - Is site housekeeping sufficient?
-
4.4 - Are edge protection control measures in place and used where gaps occur in railings?
-
4.5 - Are railings in good condition and adequate?
-
4.6 - Are materials stored safely with clearly marked storage areas?
-
4.7 - Is adequate temporary lighting on site?
-
Type of temp lighting used?
- Festoon lights
- fluorescent ceiling hung
- fluorescent floor standing
-
4.8 - Have hidden services been identified and locations marked?
-
4.9 - Is waste being stored on site in safe area between regular waste removal?
-
4.10 - Is site security adequate to prevent unauthorised access?
-
4.11 - Is there appropriate segregation of the general public?
-
4.12 - Are there adequate welfare facilities on site? (Toilet, Sink, Hot Water)
-
4.13 - Are there adequate canteen facilities on site? (Table, Chairs, Microwave, Kettle)
5.0 - Plant & Machinery
-
5.1 - Are all power tools 110v?
-
5.2 - Are all plant PAT tested within the last 6 months?
-
5.3 - Are thorough visual examinations of tools being carried out?
-
5.4 - Are guards on tools in good condition?
-
5.5 - Is dust extraction being used on tools?
-
5.6 - Are all waste materials being removed and stored safely?
6.0 - Electrical Safety
-
6.1 - Is there a Temp Electrical Supply Certificate?
-
6.2 - Is the electrical Distribution board and supply locked off and safe?
-
6.3 - Is 110v site temp power installed, if so is it safe and secure?
-
6.4 - Is 240v power on site, if so is it safe and secure?
-
6.5 - Are all leads for power and lighting secure and not trailing?
-
6.6 - Are all cables free from damage and fray?
-
6.7 - Are all portable power tools in a good safe condition?
7.0 - Working at height
-
7.1 - Are step ladders being used on site?
-
7.1a - Are all steps class 1 and in good condition?
-
7.1b - Are all step ladders Industrial strength? (Non Household rated, check label.)
-
7.1c - Are all steps being used correctly and safe use observed?
-
7.2 - Are ladders being used on site?
-
7.2a - Are all ladders Class 1 or 2 and in good condition?
-
7.2b - Are ladders securely fastened and extend to a minimum of 1m above surface?
-
7.2c - Are ladders at 1:4 ratio and on flat and stable surface?
-
7.3 - Are scaffold towers being used on site?
-
7.3a - Are Scaf tags fitted and signed?
-
7.3b - Is equipment erected correctly? (Toe boards, guard rails)
-
7.3c - Is there a Pasma trained operative on site erecting / checking the construction of the tower?
-
7.4 - Are MEWPs being used on site?
-
7.4a - Is the equipment being inspected regularly and signed off?
-
7.4b - Is there an exclusion zone marked out below?
-
7.4c - Is the PASMA trained operative using MEWP?
-
7.5 - Is suitable edge protection in place?
8.0 - Personal Protection Equipment
-
8.1 - Are PPE rules being adhered to?
-
8.2 - Is additional PPE available for specific tasks (Googles, Ear defenders, masks)
9.0 - Occupational Health
-
9.1 - Is control of noise being considered and controlled?
-
9.2 - Is control of vibration being considered and controlled?
-
9.3 - Is control of dust being considered and controlled?
10.0 - Fire Procedures
-
10.1 - Is a suitable and sufficient evacuation plan in place?
-
10.1a - Is the plan included in the site induction process?
-
10.2 - Is fire plan displayed on site?
-
10.3 - Is fire exit signage displayed on site?
-
10.4 - Are fire points on site and in relevant positions? (at least one on each floor)
-
10.4a - Are extinguishers adequate, in date, and with correct signage?
-
10.4b - Is there a fire alarm sounder available and in working order?
11.0 - Sign Off
-
On site representative (Foreman/Supervisor)
-
Auditor's signature
-