Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
Inspection area
-
Document number
Health And Safety Inspection Checks
-
Areas clean and tidy and protection installed (by others)?
-
Areas are free of materials and waterproofed?
Pre-installation check
-
Check the compartmentation strategy and agree how this will be<br>identified on site (mark soffits?)
-
Ensure that the proposed service penetrations have been<br>agreed with drylining SCP, M&E SCP, fire stopping SCP.
-
Check door schedule include door weights included and have<br>been issued to Drylining SCP.
-
Plasterboard, accessories, metal sections and plasters are stored in dry conditions
Specification and Drawing
-
Confirm Specification
-
Confirm Drawing
Quality Assurance
-
Correct fixings used to secure tracks and channels to structure
-
Fire Strip installed
-
Up to 72mm channels fixed using fixings at 600mm centres
-
92mm and 146mm channels fixed using fixings at 300mm staggered centres
-
Correct gauge and dimension of stud and channel used
-
Stud centres as per specification including any localised variation
-
Correct splicing detail used for extending the length of studs
-
Service support pattress installed as per agreed specification
-
Full-height studs on either side of the door opening fixed to the channel
-
At the door opening channels were cut and bent as per the manufacturer's details
-
Floor channel fixed both sides of opening with four fixings
-
Studs either side of opening sleeved with channel and fixed
-
Fixing strap used at horizontal board joints as per the manufacturer's installation guidance.
Boarding and deflection
-
Boards and studs cut short of soffit
-
No fixings into head channel
-
Fixing Strap used to maintain 300mm fixing centres
-
Screw centres at 300mm centres - 200mm at external corners
-
Ensure service penetration in the head detail is done as per the manufacturer's installation guidance.
-
Work area cleaned
Signed of:
-
Inspected By:
-
Completed on