Title Page

  • Site:

  • Location

  • Created by

  • Specification:

First and second fix

  • Confirm MEP overhead is complete and sign-<br>off before ceiling framing. <br>

  • Confirm MEP rough opening layout <br>complete.

  • Confirm the wall are fire taping and MEP <br>caulking completely.

  • Confirm specification

  • Confirm drawing

  • Check that correct pattresses have been provided for M&E fixing

  • Check all required hangers are provided, securely fixed and vertical and with appropriate centres in accordance with manufacture guidance.

  • Check the ceiling is fixed to correct line and level.

  • Check the ceiling insulation installed correctly

  • Check if the correct plasterboard and number of layers are fixed following manufacturer guidance.

  • Check the distance between screws/ and right fixings as per manufacture guidance.

  • Access panels provided at specified location

Sign off

  • All evidences and action closed by:

  • Left area tidy for following trades

  • Date closed

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.