Title Page
-
Document nr
-
Location
-
Created by
-
Specification:
-
Site:
Partitions 2nd fix
-
Area clear and free of obstructions?
-
Deflection head installed as per specification?
-
BWIC openings formed as per spec?
-
Fixing centres @ 300mm C/C 150mm around doors and windows?
-
Where applicable, patressing / noggins installed as per specification?
-
Correct boards used?
-
Correct spec and thickness of insulation installed
Signed off
-
Inspected by:
-
Signature
-
Completed on: