Title Page
-
Document number
-
Site:
-
Location
-
Created by
-
Specification:
Tape and Jointing
-
Received handover to commence works?
-
Areas clean and tidy and protection installed (by others)?
-
Check the board surfaces are reasonably dry, clean and protected from the weather?
-
All tapes installed correctly as per specification (paper tape)?
-
Check the correct fixings have been used and they are located as per the manufacturer's recommendations with their heads just below the liner surface.
-
Check the boards are securely fixed with no steps between adjacent boards.
-
Check corners square and plumb installed as per specification.
-
Check the ambient temperature is within specified limits and that the background lighting is adequate.
-
Check that jointing compound is trowel applied in two or three layers fathered out of beyond the previous layer.
-
All surfaces finished within 3mm tolerance?
Sign Off
-
All floors scraped and swept clean?
-
Materials, packaging and waste removed ready for following trades
-
SIGNED:
-
DATE: