Title Page

  • Document number

  • Site:

  • Location

  • Created by

  • Specification:

Tape and Jointing

  • Received handover to commence works?

  • Areas clean and tidy and protection installed (by others)?

  • Check the board surfaces are reasonably dry, clean and protected from the weather?

  • All tapes installed correctly as per specification (paper tape)?

  • Check the correct fixings have been used and they are located as per the manufacturer's recommendations with their heads just below the liner surface.

  • Check the boards are securely fixed with no steps between adjacent boards.

  • Check corners square and plumb installed as per specification.

  • Check the ambient temperature is within specified limits and that the background lighting is adequate.

  • Check that jointing compound is trowel applied in two or three layers fathered out of beyond the previous layer.

  • All surfaces finished within 3mm tolerance?

Sign Off

  • All floors scraped and swept clean?

  • Materials, packaging and waste removed ready for following trades

  • SIGNED:

  • DATE:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.