Title Page
-
Document No.
-
UPRN
-
Audit Title
-
Site Address
-
Conducted on
Customer Satisfaction
-
Customer Available?
-
Customer name
-
Where you satisfied with the appointment arrangements?
-
Was the appointment kept?
-
Did you receive notice the operative was on route?
-
Did the operative show their ID?
-
Did the operative explain the works to be undertaken appropriately?
-
Was the operative polite?
-
In your opinion was the work completed in a timely fashion?
-
Customer
Details of Works
-
Workstream
-
Name of operative/company
-
Description of Works:
-
The works are complete
-
Was a certificate required?
-
Has it been issued?
-
Type of certificate/s issued
- minor works
- completion
- EICR
- fire system
- PPM
-
Is this the correct type of certification?
-
Have the works been completed to the correct standards
-
COMMENTS:
-
Do test results match the inspectors results? (*Acceptable tolerance allowance)
-
Test 1 - Contractor/Tester results
-
Test 1 - Auditor test results
-
Test 2 - Contractor/Tester
-
Test 2 - Auditor test results
Physical Inspections
-
Where appropriate a physical inspection of items should be undertaken. Face plates & accessories should be removed for inspection.
-
A physical inspection (opening up) has been carried out
-
Inspection items
-
Quality of workmanship
-
What is the outcome of the inspected items
-
Have suitable labels been fitted?
-
The works are in progress
-
Are the work area & subsequent access routes clean & free from materials & debris?
-
Is the operative wearing appropriate PPE?
-
Has the safe isolation procedure been followed?
-
Has a "lock off kit been" used?
-
Have suitable warning notices been posted?
-
Have barriers been erected where required?
-
Have adequate access arrangements been made?
-
Is the operative observing safe working practices?
-
Have materials been correctly selected?
-
Have materials been correctly erected?
-
Has the operative ascertained the safety of the overall installation?
-
Have any additional works been identified?
Covid19 - Control Measures
-
Covid19 Measures apply?
-
Contractor RAMS must be reviewed.
-
We’re all operatives using suitable & appropriate face covering?
-
Suitable social distancing was being observed
-
Suitable, sufficient & appropriate antibacterial cleaning materials available & in use
-
Is certification required on completion?
-
Type of certification
- minor works
- completion
- EICR
- fire system
- PPM
-
Have works been explained to the customer & associated documentation left in their possession?
-
Have any training issues been identified?
Evaluation
-
Q.A. Inspection - Defect Category Guidance: A traffic light system is in place to record and evaluate the outcome of the ETO audit inspection. Any findings will be recorded and categorized based on risk and identified by colour, Green, Amber or Red. A mix of the ETO engineering judgement and guidance from publications such as the Napit Codebreaker and Electrical Safety-First Best Practice Guide 4 will be used to assign observations or individual defects into categories. This will determine the outcome of the Q.A. Inspection. The 3 categories will be as follows:
• GREEN – Any inspection that only highlights up to 4 minor defects worthy of a C3 classification code. Also showing evidence of good working practices and completed in accordance with the Great Places Electrical Safety Policy and Electrical Management Plan.
• AMBER – Any audit inspection that highlights an accumulation of between 5-7 minor defects worthy of a C3 classification code. Any individual defect worthy of a C2 classification code.
• RED – Any audit inspection that highlights 8 or more minor defects worthy of a C3 classification code. 2 or more individual defects worthy of a C2 classification code. Any individual defect found to be worthy of a C1 classification code.
Observations/Defects found
-
Have any observations been found?
-
Observation code
-
Description of observation
Overall Evaluation
-
Outcome
-
Score Summary
- 1-4 C3 observations
- 5-7 C3 observations
- 8+ C3 observations
- 2+ C2 observations
- C1 observation
- =<1 C2 observation
Competence
-
Is the operative available
-
Are all tools suitable & sufficient for purpose, suitably VDE approved.
-
Proving unit available & in serviceable condition
-
Wander lead available & in serviceable condition
-
Multi installation tester available & in serviceable condition
-
All equipment suitably PAT
-
Operative has suitable equipment to ensure torque levels are achieved
-
Suitable voltage indicator/detection equipment available & in serviceable condition
-
Does all access equipment have suitable inspection labels present
-
Auditor to ask a random set of questions relating to the specification.
-
Was the operative adequately aware of the specification
Quiz: Knowledge Base
-
Auditor to ask 2 random questions from the competency question set
-
Question 1
- Q2: State the formulae to determine the earth fault loop impedance of a circuit?
- Q8) When measuring end to ends on a ring circuit, what approximate value would you expect from the cpc in relation to the line conductor to be?
- Q10) When testing main bonding conductors what reading would you expect?
- Q11) When testing Prospective Fault Current; what reading would you expect & how would you confirm its suitability?
- Q20.1) State which main British Standard covers Fire Detection Systems
- Q20.2) State which main British Standard covers Emergency Lighting
- Q21) In what circumstance if any, could it be considered appropriate to work on or near live conductors within a domestic dwelling?
- Q22.1) In relation to work on or near live conductors state What document specifies the requirements for work on or near live conductors?
- Q22.2) State the document & regulation number that specifies the requirements for work on or near live conductors?
- Would Installing a security light to a external party wall be covered under Part P?
-
Answer 1
-
Result
-
Question 2
- Q2: State the formulae to determine the earth fault loop impedance of a circuit?
- Q8) When measuring end to ends on a ring circuit, what approximate value would you expect from the cpc in relation to the line conductor to be?
- Q10) When testing main bonding conductors what reading would you expect?
- Q11) When testing Prospective Fault Current; what reading would you expect & how would you confirm its suitability?
- Q20.1) State which main British Standard covers Fire Detection Systems
- Q20.2) State which main British Standard covers Emergency Lighting
- Q21) In what circumstance if any, could it be considered appropriate to work on or near live conductors within a domestic dwelling?
- Q22.1) In relation to work on or near live conductors state What document specifies the requirements for work on or near live conductors?
- Q22.2) State the document & regulation number that specifies the requirements for work on or near live conductors?
- Would Installing a security light to a external party wall be covered under Part P?
-
Answer 2
-
Result
Specification
-
Is there a specification of works?
-
Have the works been completed to the specification?
Fire propagating Structures
-
Is the property of a fire propagating structure (eg: timber framed)
-
Have AFDDs been installed
-
Does the property have suitable SPD protection
-
Is the early warning system a minimum of LD2+heat
-
Do all outlet penetrations have suitable instrument protection (eg: putty pads)
-
Do kitchen fans have suitable filtration (eg: a Greece filter)
-
do all pendants have suitable fire rated seals
-
are all down-lights & recessed luminaries suitably fire rated
-
are all cables above suspended ceilings suitably supported to prevent premature collapse
-
Are all distribution boards made from a non-combustible material (eg: Metal)
Summary
Summary
-
Have any additional works been identified that may impair electrical safety?
-
Further action required?
-
Contact the Contractor immediately. Make safe where required & ensure safety.
Contractor
-
External contractor?
-
Have additional works been identified/completed - either above thresholds or REME
-
We're these additional works authorised?
Any other comments, notes or items
-
item - comment or comment/Image
-
Add media
-
Outcome of observation
Inspector/Auditor Details
-
Date of job
-
Job number
-
Signature