Information
-
Audit Title (shop)
-
Add location
-
Conducted on
-
Prepared by
-
Damage Evaluator
-
Repair Order #
-
Insurance Company
- AAA
- Allied
- Allstate
- Ameriprise
- Amica
- Auto Owners
- Bristol & West
- Citizens
- Chartis
- Corporate Claims Management
- eAutoclaims Network
- E M C
- Encompass
- Esurance
- Farm Bureau
- Farmers
- Fleet
- Frankenmuth
- Geico
- GMAC
- Horace Mann
- Innovation Group
- Liberty Mutual
- Lynx
- Map
- Meemic
- Michigan Millers
- National Alliance
- Nationwide
- Other
- Owner Pay
- Progressive
- Safco
- Secura
- State Auto
- State Farm
- Travellers
- USAA
- Zurich
-
Type of Inspection
Pre-Repair
Pre-Repair
-
Signed Customer/insurance authorization obtained
-
Estimate of Record/supplements in PDF file
-
PDF/Scanned proper documents
-
Tow Bill posted
-
Required Photos in CMS
-
VIR filled in correctly
-
Upsell on UPD
-
Autowatch completed (at least one image each business day while vehicle has been on site)
-
Proof of communication (documented in UCMS, who spoken to, what about, any questions & next call)
-
Manufactures repair data (supporting data refers to estimate)
-
Liquid Mask & other protective covers applied ( Liquid mask applied on all none repair panels & convertible roofs covered)
-
Initial documentation in vehicle ( windshield tag, VIR form, ID sheet, QC sheet)
-
Work order in vehicle ( up to date work order in vehicle reflecting work being pro-formed )
-
Repair admin details on vehicle ( details note on glass In & out date, RO#, Insurance company, DE, area of damage & special instructions )
-
Repairs are "mapped out"/UPD noted
-
100% Teardown completed/bagged parts ( all parts are completely tore-down, small items are placed in bags )
-
QC sign off completed
Body / Frame
Body / Frame Repairs
-
Work performed matches appraisal
-
Welds (any missing, not ground down, poor quality)
-
Rocker flanges repaired ( both outer & inner sides)
-
Seam sealers & foams applied (correct seam sealer & foams applied in all areas to a consistent OEM standard)
-
Corrosion protection/undercoating applied (all corrosion protection applied inside of panels & cavities, under coating applied under side of replaced & repaired panels)
-
Body lines & gaps ( all repaired & replacement panels align & body lines are to OEM standards)
-
Filler work (smooth to the correct grit, straight & no pin holes)
-
Bolt on panels (no holes elongated)
-
External parts properly stored on carts (all parts on part carts & organized)
-
Internal parts properly stored on carts ( all internal trim stored on parts carts & protected)
-
Frame specs in CMS (image of frame spec before & final in CMS files)
-
Wheel Alignment (wheel alignment specs scanned into CMS)
-
QC Sheet signed off (QC sheet correct sign off on body\frame departments)
-
Body Tech
-
Frame tech
Refinish
Refinish
-
Worked performed matches appraisal (work completed matches the work order in the vehicle)
-
Chip guard applied (chip guard applied to match OEM standards)
-
Jamb & underside painted (All jambs & underside painted panels matches OEM standards)
-
Color matches & spray out card (all painted panel matches existing paint finishes & spray out card completed or in painters library)
-
Blends are invisible ( all blends are consistent to OEM paint finishes)
-
No imperfection in paint work ( no dirt, no fish eyes, no runs & texture matches OEM finishes)
-
No tape lines or overspray ( no tape lines on any panel edges or joints & no overspray on vehicle )
-
Buffing, polishing & cleaned ( all panels are buffed, polished & cleaned before assembly )
-
QC sheet sign off completed ( QC sheet sign of correctly )
-
Painter
Detailing
Detailing
-
Exterior washed & detailed correctly ( complete exterior of the vehicle washed & detailed )
-
Windows cleaned ( all glass cleaned inside & outside. No overspray )
-
Strips & decals installed ( all body stripe, decals & labels installed to original or OEM standards )
-
Tires pressures checked & tire dressing applied ( all tire pressures check against recommend posted pressures in door jams & not on tire. Dressing applied to a consistent level )
-
Fluid levels checked ( engine oil & transmission oil levels checked & noted on QC sheet if low. Radiator & solvent levels all topped off at recommend levels )
-
Battery charged & cables tight
-
Door, hood & trunk jambs clean ( all jambs clean & free off overspray )
-
All light working ( all external & internal lights working )
-
Touch up paint in vehicle ( touch paint in approved bottle & in safe area in vehicle )
-
All old parts removed from vehicle ( all old parts removed from vehicle unless customer requested to safe old parts, then placed in bag in the trunk of the vehicle )
-
Stereo system & gps set ( all audio system & GPS working to OEM standards )
-
Convenience systems working correctly ( all drive aids working to OEM standards )
-
QC sheet signed off ( QC sheet signed off correctly and noted any problems )
-
Detailer
Other
Other
-
Final billing process completed
-
DRP requirements followed
Comments & Final Sign off
Total & comments
-
Comments on the completed Quality Assurance Inspection
-
Damage Evaluator
-
GM signature
-
Inspectors signature