Title Page

  • Site conducted

Audit Details

  • Auditor Name:

  • Conducted on

Project Manager

  • Client:

  • Project Manager:

  • Site No and Name:

  • Site Postcode:

  • Site Type:

  • Scope of Works:

  • Person in Charge of Works:

  • Other Team Members:

1. Audit Questions

  • Job Type:

INSTALLATION

  • Has a clear access route been created to the equipment and structure?

  • Has all waste generated by 8point8 works been removed from site?

  • Have all operators ladders been certified / tagged?

  • Is the Safe to Climb certificate present?

  • Have all operators fall arrest systems been certified / tagged?

  • Are the operators fall arrest system certificates available?

  • Have the operators eyebolts been certified / tagged?

  • Are the operators eyebolt certificates available?

  • Has the Lightning Protection (LP) test been completed?

  • Is the Lightning Protection (LP) test certificate available?

  • Have all air conditioning / fan units been inspected and filters cleaned?

  • Does the report include clear evidence of an "at height" check?

  • Have adequate pictures been uploaded?

  • Have the correct defects been logged?

  • Has the handover report been approved / rejected?

ADDITIONAL INFORMATION

  • Is there any other quality issues on site not yet identified by this audit?

INSTALLATION

  • Have all required works been completed as per the scope / job instruction?

  • Have the correct materials been used for the works?

  • Has the scope, drawings or plans been adhered to?

  • Has the site been reinstated correctly?, and left in a satisfactory condition?

  • Has the site been left clean and tidy? (EG plant, machinery, waste, debris etc. removed)

  • Does the Handover Pack (HOP) contain the required photos, information and certification?

ADDITIONAL INFORMATION

  • Is there any other quality issues on site not yet identified by this audit?

INSTALLATION

  • Is there a separate fire alarm system installed? (not combined with intruder alarm)

  • Has the work been carried out as per instruction from client?

  • Has the work been carried out to BS5389 - Part 1?

  • Is the panel showing healthy with no faults?

  • Has the panel got the correct fire isolation switch installed?

  • Is the installation wired in Red FP200 or fireproof cabling?

  • Are there sufficient smoke / heat detectors installed?

  • Does the installation contain a minimum of 2 sounders?

  • Is there a manual call point installed?

  • Is the system linked to the landlords system?

  • Is the mains supply correctly identified within the distribution board?

  • Are all warning / advisory notices installed?

  • Are all cables installed neatly with sufficient support? (EG metal tie wraps or P clips)

  • Have any cable ties been cut flush?

  • Are all cables glanded into devices satisfactorily?

  • Are the glands tight and secure?

  • Is the installation generally tidy and acceptable?

  • Has the site been cleared of all waste generated by the installation?

TESTING AND INSPECTION

  • Has the HOP been completed and on i-auditor?

  • Has the NICEIC design certificate been issued?

  • Has the NICEIC installation certificate been issued?

  • Has the NICEIC commissioning certificate been issued?

  • Are the certificates completed correctly as per BS5389 Part1 ?

ADDITIONAL INFORMATION

  • Are there any other quality issues relating to this site? (describe below)

2. Site Photos

  • Site Photos

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.