Title Page

  • Depot

  • Date Audit Conducted

  • Depot Responsible Person

  • Prepared by

Process - STR

  • Auditee

  • Number of STR trucks on STR fleet?

  • Number of STR trucks currently on site?

  • STR sample pack 1

  • Customer Name

  • Truck Number

  • Hire Agreement Number

  • STR Log completed (add log number in notes)

  • QMS01 Enquiry Form completed (add image)

  • QMS02 Credit application form completed (only for new customers not existing)

  • QMS03 Signed Prep Sheet (add image)

  • QMS19 Site Survey completed (only for new customers not existing)

  • QMS76 STR Checklist completed and signed by both parties (add image)

  • QMS79 or Autoline off hire notification number

  • GRN Number

  • In date Hired in Plant insurance certificate (add image)

  • In date LOLER Certificate (add image)

  • Signed transport POD out (QMS47) (add image)

  • Signed transport POD in (QMS47) (add image)

  • Signed STR Hire Agreement (add image)

undefined

  • STR Sample Pack 2

  • Customer Name

  • Truck Number

  • Hire Agreement Number

  • STR Log completed (add log number in notes)

  • QMS01 Enquiry Form completed (add image)

  • QMS02 Credit application form completed (only for new customers not existing)

  • QMS03 signed prep sheet (add image)

  • QMS19 Site Survey completed (only for new customers not existing)

  • QMS76 STR checklist completed and signed by both parties (add image)

  • QMS79 or Autoline STR off hire notification number

  • GRN Number

  • In date Hired in Plant insurance certificate (add image)

  • In date LOLER Certificate (add image)

  • Signed transport POD out (QMS47) (add image)

  • Signed transport POD in (QMS47) (add image)

  • Signed STR Agreement (add image)

Buy Back Process

  • Sample 1

  • Has latest version of QMS08 been used (add image)

  • Truck Number

  • Buy Back Dated

  • All relevant boxes completed (in top half of form)

  • Picture of truck attached

  • Term box selected (1-7)

  • Rental Controller Signed and Dated

  • Depot Manager Signed and Dated

  • Sample 2

  • Has latest version of QMS08 been used (add image)

  • Truck Number

  • Buy Back Dated

  • All relevant boxes completed (in top half of form)

  • Picture of truck attached

  • Term box selected

  • Rental Controller Signed and Dated

  • Depot Manager Signed and Dated

  • Sample 3

  • Has latest version of QMS08 been used (add image)

  • Truck Number

  • Buy Back Dated

  • All relevant boxes completed (in top half of form)

  • Picture of truck attached

  • Term box selected (1-7)

  • Rental Controller Signed and Dated

  • Depot Manager Signed and Dated

STR Stock Take

  • STR Stock Take Completed (add month in notes)

  • QMS59 Stock Take Form completed and Signed by Counter and STR Controller (add image)

  • QMS58 Stock Take Discrepancy Form completed

Thorough Examination (TE's) Reviewed

  • Sample 1

  • Name of Engineer / company (SI) that completed the TE

  • Record Number / Certificate Number (add image)

  • Examination Date

  • Are all 'Details of Equipment' completed

  • Sample 2

  • Name of Engineer / company (SI) that completed the TE

  • Record Number / Certificate Number (add image)

  • Examination Date

  • Are all 'Details of Equipment' completed

  • Sample 3

  • Name of Engineer / company (SI) that completed the TE

  • Record Number / Certificate Number (add image)

  • Examination Date

  • Are all 'Details of Equipment' completed

GRN

  • Sample 1

  • GRN / WIP Number

  • Dated

  • Is GRN fully completed

  • Sample 2

  • GRN / WIP Number

  • Dated

  • Is GRN fully completed

  • Sample 3

  • GRN / WIP Number

  • Dated

  • Is GRN fully completed

Process - Service

  • Auditee

  • Total Number of Engineers

  • Number of Overdue Services

Service Records Review

  • Sample 1

  • Fleet Number

  • Customer

  • WIP Number

  • Date

  • Engineer

  • Technician Notes completed and relevant

  • PTA Completed (if no add note)

  • SSRA Completed (if no add note)

  • 4 approval photos (including hour metre reading & capacity plate)

  • Is service status 'Complete'

  • Signed by Customer (add customer name in notes)

  • Sample 2

  • Fleet Number

  • Customer

  • WIP Number

  • Date

  • Engineer

  • Technician Notes completed and relevant

  • PTA completed (if no add notes)

  • SSRA completed (if no add notes)

  • 4 approval photos (including hour metre reading and capacity plate)

  • Is service status 'Complete'

  • Signed by customer (add name in notes)

  • Sample 3

  • Fleet Number

  • Customer

  • WIP Number

  • Date

  • Engineer

  • Technician notes completed and relevant

  • PTA completed (if no add note)

  • SSRA completed (if no add note)

  • 4 approval photos (including hour metre reading & capacity plate)

  • Is service status 'Complete'

  • Signed by customer (add name in notes)

Break Down Records Review

  • Sample 1

  • Fleet Number

  • Customer

  • WIP

  • Date

  • Engineer

  • Reason of break down / issue

  • Technician notes completed and relevant

  • PTA completed (if no add note)

  • SSRA completed (if no add note)

  • 4 approval photos (including hour metre reading & capacity plate)

  • Signed by customer (Add name in notes)

  • Does the customer have an SLA / response time (if yes was the response time met)

  • Sample 2

  • Fleet Number

  • Customer

  • WIP

  • Date

  • Engineer

  • Reason for break down / issue

  • Technician notes completed and relevant

  • PTA completed (if no add note)

  • SSRA completed (if no add note)

  • 4 approval photos (including hour metre reading & capacity plate)

  • Signed by customer (add name to notes)

  • Does the customer have an SLA / response time (if yes was the response time met)

  • Sample 3

  • Fleet Number

  • Customer

  • WIP

  • Date

  • Engineer

  • Reason for break down / issue

  • Technician notes completed and relevant

  • PTA completed (if no add note)

  • SSRA completed (if no add note)

  • 4 approval photos (including hour metre reading & capacity plate)

  • Signed by customer (add name to notes)

  • Does the customer have an SLA / response time (if yes was the response time met)

Engineer Van Checks

  • Sample 1

  • Engineer Name

  • Van Registration

  • Date of check

  • Was the vehicle safe to drive (add notes if applicable)

  • Approval photos (add notes if applicable)

  • Sample 2

  • Engineer Name

  • Van Registration

  • Date of check

  • Was the van safe to drive (add notes if applicable)

  • Approval photos (add notes if applicable)

  • Sample 3

  • Engineer Name

  • Van Registration

  • Date of check

  • Was the van safe to drive (add notes if applicable)

  • Approval photos (add notes if applicable)

Engineer Ladder Checks

  • Sample 1

  • Engineer

  • Date of check

  • Ladder ID

  • Was the ladder safe to use

  • Approval photo

  • Sample 2

  • Engineer

  • Date of check

  • Ladder ID

  • Was the ladder safe to use

  • Approval photo

  • Sample 3

  • Engineer

  • Date of check

  • Ladder ID

  • Was the ladder safe to use

  • Approval photo

Process - Parts

  • Auditee

  • Engineer requests part through RT Parts - is process compliant (add notes)

  • CAT Order - is process compliant (add notes)

  • Ordering a part on TVH or other supplier portal - is process compliant (add notes)

Process - Training & Communication - Depot Manager

  • Auditee

  • Are Engineer Supervisory Report being completed

  • Sample 1

  • Engineer Name

  • Name of senior engineer completing the report

  • Date report completed

  • Sample 2

  • Engineer Name

  • Name of senior engineer completing report

  • Date report completed

  • Sample 3

  • Engineer Name

  • Name of senior engineer completing report

  • Date report completed

Training Course Summary

  • Do you have visibility of the training matrix on Teams

  • Sample 1

  • Engineer Name

  • Are the above engineers compulsory courses all in date

  • Risk Assessment Course Date

  • Manual Handling Course Date

  • Working at Height Course Date

  • Jacking & Blocking Course Date

  • Routine Maintenance Course Date

  • Abrasive Wheel Course Date

  • Lifting & Slinging Course Date

  • Driver Training B1

  • Driver Training A1

  • Driver Training D1

  • Sample 2

  • Engineer Name

  • Are the above engineers compulsary courses all in date

  • Risk Assessment Course Date

  • Manual Handling Course Date

  • Working at Height Course Date

  • Jacking & Blocking Course Date

  • Routine Maintenance Course Date

  • Abrasive Wheel Course Date

  • Lifting & Slinging Course Date

  • Driver Training B1

  • Driver Training A1

  • Driver Training D1

  • Sample 3

  • Engineer Name

  • Are the above engineers compulsory courses all in date

  • Risk Assessment Course Date

  • Manual Handling Course Date

  • Working at Height Course Date

  • Jacking & Blocking Course Date

  • Routine Maintenance Course Date

  • Abrasive Wheel Course Date

  • Lifting & Slinging Course Date

  • Driver Training B1 Course Date

  • Driver Training A1 Course Date

  • Driver Training D1 Course Date

Tool Box Talks & Safety Bulletins

  • Sample 1

  • Tool Box Talk name

  • Engineer Name

  • Date Tool Box Talk completed

  • Sample 2

  • Tool Box Talk name

  • Engineer Name

  • Date Tool Box Talk completed

  • Sample 3

  • Tool Box Talk name

  • Engineer Name

  • Date Tool Box Talk completed

RAMS & COSHH Acknowledgements (current year)

  • Have all your members of staff acknowledged their RAMS on 360 learning

  • Have all your members of staff acknowledged their COSHH on 360 learning

Process - Equipment Inspection & Test - Depot Manager

  • When was your last Tek-Cal Inspection

  • Is your current Tek-Cal colour code poster displayed in the depot (add where to notes)

  • What colour tags are currently being used in the workshop for lifting equipment

  • Ladder Inspections

  • LOLER Inspections

  • Fall Arrest Inspections

  • Load Test Inspections

  • Van Weights

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.