Title Page

  • Site conducted

Audit Details

  • Auditor Name:

  • Conducted On:

Project Details

  • Client:

  • Project Manager:

  • Site No and Name:

  • Site Postcode:

  • Scope of Works:

  • Person in Charge of Works:

  • Other Team Members:

Audit Questions

  • Main Activity:

  • Sub Activity:

INSTALLATION

  • Has the work been completed as per client specification documents?

  • Has the work been completed in line with the requirements of BS7671?

  • Is the installation generally tidy and acceptable?

  • Are circuits and equipment labelled satisfactorily?

  • Are terminations tight?

  • Has the correct sleeving been used where appropriate?

  • Have circuit breakers of the correct type and rating been used?

  • Have the correct glands been used, with shrouds fitted?

  • Have banjos and fly leads been connected where appropriate?

  • Are glands tight and secure?

  • Have cables been adequately secured throughout?

  • Have ducts been filled where appropriate?

  • Has the correct type of cable been used?

  • Have cable tie tails been cut flush?

  • Has an RCD been used where required?

  • Have exposed metal crimps had heat shrink applied?

  • Has all earthing been completed satisfactory?

  • Has the structural earth been connected and checked?

  • Are all cables installed using appropriate bootlace crimps?

  • Has the site been left safe and tidy, with all waste generated by 8Point8 works removed?

TESTING AND INSPECTION

  • Has the correct installation / DC certificate been completed?

  • Have the correct details been completed on the certificate as appropriate?

  • Do the test readings listed concur with readings on site?

  • Has the correct earthing / supply system been identified?

ADDITIONAL INFORMATION

  • Is there any other quality issues on site not yet identified by this audit?

INSTALLATION

  • Has the work been completed as per client specification documents?

  • Has the work been completed in line with the requirements of BS7671?

  • Is the installation generally tidy and acceptable?

  • Are circuits and equipment labelled satisfactorily?

  • Are terminations tight?

  • Has the correct sleeving been used where appropriate?

  • Have circuit breakers of the correct type and rating been used?

  • Have the correct glands been used, with shrouds fitted?

  • Have banjos and fly leads been connected where appropriate?

  • Are glands tight and secure?

  • Have cables been adequately secured throughout?

  • Have ducts been filled where appropriate?

  • Has the correct type of cable been used?

  • Have cable tie tails been cut flush?

  • Has an RCD been used where required?

  • Have exposed metal crimps had heat shrink applied?

  • Has all earthing been completed satisfactory?

  • Has the structural earth been connected and checked?

  • Has the screen been energised and working correctly?

  • Has the site been left safe and tidy, with all waste generated by 8Point8 works removed?

TESTING AND INSPECTION

  • Has the correct installation / minor works certificate been completed?

  • Have the correct details been completed on the certificate as appropriate?

  • Do the test readings listed concur with readings on site?

  • Has the correct earthing / supply system been identified?

ADDITIONAL INFORMATION

  • Is there any other quality issues on site not yet identified by this audit?

INSTALLATION

  • Has the work been completed as per client specification documents?

  • Has the work been completed in line with the requirements of BS7671?

  • Is the installation generally tidy and acceptable?

  • Are terminations tight?

  • Has the correct sleeving been used where appropriate?

  • Have circuit breakers of the correct type and rating been used?

  • Have the correct glands been used, with shrouds fitted?

  • Have banjos and fly leads been connected where appropriate?

  • Are glands tight and secure?

  • Have cables been adequately secured throughout?

  • Has the correct type of cable been used?

  • Have cable tie tails been cut flush?

  • Has an RCD been used where required?

  • Have exposed metal crimps had heat shrink applied?

  • Has all earthing been completed satisfactory?

  • Are the cable stanchions secured correctly and positioned as per plans?

  • Are all cable stanchions marked with warning tape around each leg?

  • Is all cable containment installed as per plans?

  • Is all cable containment fastened and secured to stanchions?

  • Are all containment and stanchions cross bonded to earth?

  • Are the cabin and generator positioned as shown on plans?

  • Has the generator been started and checked for correct operation?

  • Are the cabin doors opening correctly now sited in position?

  • Are all the batteries within the cab secured?

  • Are all the battery connections tight?

  • Are all the bottom trims installed around the cab correctly?

  • Are the cab steps installed and fixed down correctly?

  • Are all guards installed around the cab?

  • Is the exhaust from the generator fitted and sealed?

  • Are the air input ducts to the air con installed correctly?

  • Are the external grilles to the ducts installed correctly?

  • Has the intruder alarm been installed as per drawings?

  • Has the fire alarm been installed as per drawings?

  • Has the door entry system been installed as per drawings?

  • Have the air conditioning isolators been installed and connected as per plans?

  • Have the air conditioning condenser cables been installed and connected satisfactorily?

  • Has the inside of the cab been left in a neat and tidy condition?

  • Has the area been left in a neat and tidy condition?

  • Are all cable tags installed and clearly marked?

  • Has the site been left safe and tidy, with all waste generated by 8Point8 works removed?

TESTING AND INSPECTION

  • Has the correct installation / minor works certificate been completed?

  • Have the correct details been completed on the certificate as appropriate?

  • Do the test readings listed concur with readings on site?

  • Has the correct earthing / supply system been identified?

ADDITIONAL INFORMATION

  • Is there any other quality issues on site not yet identified by this audit?

INSTALLATION

  • Is there a separate fire alarm system installed? (not combined with intruder alarm)

  • Has the work been carried out as per instruction from client?

  • Has the work been carried out to BS5389- part 1?

  • Is the panel showing healthy with no faults?

  • Has the panel got the correct fire isolation switch installed?

  • Is the installation wired in Red FP200 or fireproof cabling?

  • Are there sufficient smoke / heat detectors installed?

  • Does the installation contain a minimum of 2 sounders?

  • Is there a manual call point installed?

  • Is the system linked to the landlords system?

  • Is the mains supply correctly identified within the distribution board?

  • Are all warning / advisory notices installed?

  • Are all cables installed neatly with sufficient support? (EG metal tie wraps or P clips)

  • Have any cable ties been cut flush?

  • Are all cables glanded into devices satisfactorily?

  • Are the glands tight and secure?

  • Is the installation generally tidy and acceptable?

  • Has the site been cleared of all waste generated by the installation?

TESTING AND INSPECTION

  • Has the HOP been completed and on i-auditor?

  • Has the NICEIC design certificate been issued?

  • Has the NICEIC installation certificate been issued?

  • Has the NICEIC commissioning certificate been issued?

  • Are the certificates completed correctly as per BS5389 Part 1?

ADDITIONAL INFORMATION

  • Are there any other quality issues relating to this site? (describe below)

  • Sub Activity:

  • Build Stage:

ACCESS

  • Does the site have adequate barriers and signage?

  • Is there vehicle parking on site?

  • Does the site require track way?

IN BUILD (LAND BASED)

  • Has the foundations been set out correctly as per drawing?

  • Are foundations dug to the correct dimensions?

  • Are the foundations in a safe condition?

  • Has the re bar been installed as per design drawing?

  • Is the HD kit installed as per specification?

  • Is the HD kit secure and bolts taped up prior to pour?

  • Is the LP tape installed as per the specification?

  • Are the ducts installed?

  • Have draw cords been installed into each duct?

  • Are LP pits installed and concreted in situ?

  • Has the concrete been vibrated during pour? (picture required)

  • Confirm finish to concrete - brushed - buried - trowel edge?

  • Are the cabinet roots set as per drawing?

  • Cabinet LP correct?

IN BUILD (GABLE)

  • Has the wall battens been set out correctly?

  • Confirm embedment depth as per drawing?

  • Have all anchors been pull tested? (confirm test requirement)

  • Confirm amount of packing to the battens?

  • Are all wall fixing centre of brick?

  • Is the mounting beam installed correctly?

  • Are all steels plumb and level?

ACCESS

  • Has Trakway/ track panels been used for the installation, if so has the ground been reinstated correctly?

  • Are access ramps / paths installed as per drawings?

  • Have the hard standings been installed to the clients requirements?

  • Are the finishes to the hard standings as per specifications?

BUILD

  • Is the installation complete?

ELECTRICAL / LP INSTALLATION

  • Has the power supply been connected in the feeder pillar?

  • Is the earthing in the meter cabinet as per specification?

  • Has the submain cable been installed correctly with sufficient clips / tags?

  • Is all necessary electrical labelling in place?

  • Is the earthing arrangements in the meter cabinet correct?

  • Are the correct number of LP pits installed?

  • Are connections to the feeder pillar steelwork Denso taped?

  • Has the NICEIC 18th Edition testing been completed?

  • If applicable, has the lighting been installed?

STEELWORK

  • Is the steelwork plumb and level?

  • Are double nuts installed correctly? (if required)

  • Do we have min 5mm thread protruding once all nuts are installed?

  • Are all fixings taught and secure?

  • Are the HD bolts Denso taped?

  • Have all paint defects been rectified?

  • Has the LP been tested to <10 ohms?

SCREEN INSTALLATION

  • Has the screen been installed with all double nuts in place?

  • Are all mounting beam fixings in place?

  • Are all head restraints applied and taught? (if required)

  • Have the base cladding brackets been set?

  • If powered up are there any hot / cold seams?

CABINETS

  • Are cabinets in the correct orientation as per drawing?

  • Are cabinets the correct colour?

  • Has the internal cabinet been sealed? (EG bitumen)

  • Have all fixings been installed in the root?

CLADDING INSTALLATION

  • Has the cladding been installed correctly?

  • Is the cladding installed with the correct gaps / joint connections / flexi foam?

  • Cladding Type:

  • Are all joints 3mm or less?

  • Are all joints lined and plumb?

  • Are corners square?

  • Are soffits level?

  • Are face fixed cladding fixings PPC coated to the correct RAL No?

  • Are the internal fixing taught and in line?

  • Are the cladding fixings back to subframe installed?

  • Has all cladding been cleaned down satisfactorily?

ACCESS

  • Has Trackway / track panels been used for the decommission, if so has the ground been reinstated correctly?

CIVILS

  • Has the power supply been disconnected in the feeder pillar?

  • Is the isolation tagged and dated?

  • Has the submain cable been removed completely including removal of cable fixings?

  • If applicable, has the lighting been removed?

  • Has the sign been fully removed?

  • Have all redundant fixings been removed?

  • If instructed, has the gable end been repainted to match the existing colour?

  • For land based signs, have all posts been cut back flush with ground level?

  • If instructed, have all bases been broken out below ground level?

  • For any areas disturbed, is the topsoil reinstatement adequate?

  • Has the reinstatement been reseeded?

  • Has the existing fence line been reinstated?

  • Does the new fencing match the existing?

  • Has the fence been erected plumb?

  • Has the fence been painted to match the existing?

  • Is the existing site now secure?

  • Has all the rubbish been removed from site?

  • Has the TM been removed from site?

  • Has all hired in plant been removed from site?

HANDOVER

  • Are before / during and after photos available?

ADDITIONAL INFORMATION

  • Are there any additional quality issues on site that have not yet been identified as part of this audit?

  • Build Phase:

POLE

  • Is the pole hatch correctly orientated? (compass check from auditor along with photo)

  • Is the pole inspection cover installed and secure?

CABINET(S)

  • Do all cabinet doors open and lock, and is the cabinet level?

  • Is the cabinet root installed as per specification? (sealed round the edges etc)

  • Have holding down bolts for the cabinet been evenly spaced out as per design specification?

  • Has bitumen seal been applied onto the concrete?

  • Is the cabinet clean and the plinth wiped clear of any concrete splashes?

  • Are all cab doors locked and secure?

DUCTING

  • Have 2 blue draw cords been installed in each duct as per specification?

  • Are all ducts cut flush as per specification?

  • Are all feeder ducts 150mm and smooth wall?

  • Are all remote fibre ducts 100mm and smooth wall?

  • Are all interconnecting ducts min 75mm and smooth wall?

OTHER

  • Are earthing connections correctly fitted and inhibitor contact paste applied?

  • Are all reinstatement works completed to an acceptable standard?

  • Have the lifting brackets been removed?

  • Has all correct site signage been installed as per client specification? (5 in total)

  • Are there any remaining HSE issues on site? (EG trip hazards, waste materials, uncollected plant or materials etc.)

ADDITIONAL INFORMATION

  • Are there any additional quality issues on site that have not yet been identified as part of this audit?

ACCESS

  • Has Trakway / track panels been used for the installation, if so has the ground been reinstated correctly?

  • Are access ramps / paths installed as per drawings?

  • Have the hard standings been installed to the clients requirements?

  • Are the finishes to the hard standings as per specifications?

ELECTRICAL / LP

  • Has the power supply been connected in the feeder pillar?

  • Is the earthing in the meter cabinet as per specification?

  • Has the submain cable been installed correctly with sufficient clips / tags?

  • Is all necessary electrical labelling in place?

  • Is the earthing arrangements in the meter cabinet correct?

  • Are the correct number of LP pits installed?

  • Are connections to the feeder pillar steelwork Denso taped?

  • Has the NICEIC 18th Edition testing been completed?

  • If applicable, has the lighting been installed?

BUILD

  • Is the installation of the sign complete?

  • Is the steelwork erected as per the detailed design drawings?

  • Are the holding down bolts Denso taped?

  • Are the cladding works complete?

  • Are there any paint defects visible on the steelwork?

  • Is the cladding completed to an acceptable standard- gaps, joints sealant etc?

  • Are all visible cladding fixings colour capped?

  • Are displays live?

  • If digital screens are installed, are they aligned correctly?

  • If light boxes have been installed, are the vinyl skins tightened sufficiently?

  • Has the screen and cladding been cleaned of all dust / watermarks?

  • Are all external cabinets in place?

  • Are all external cabinets painted the correct colour?

  • For any areas disturbed, is the topsoil reinstatement adequate?

  • Has the reinstatement been reseeded?

  • If new fencing is installed, does the new fencing match the existing?

  • Has the fence been erected plumb?

  • Has the fence been painted to match the existing?

  • Have ground base cabs been levelled and grouted?

  • Are the cabs accessible with no obvious hazards?

  • Has the trunking to the screen been correctly installed?

  • Has all the fixings been double nutted / licking nut installed?

  • Has the branding bar been installed and is it visible over the fence line?

  • Has all the rubbish been removed from site, including rubbish from the installation of the screens?

  • Has the Traffic Management been removed from site?

  • Has all hired in plant been removed from site?

HANDOVER

  • Are before / during and after photos available?

Site Photos

  • Site Photos

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.