Title Page
-
Site conducted
Audit Details
-
Auditor Name:
-
Conducted On:
Project Details
-
Client:
-
Project Manager:
-
Site No and Name:
-
Site Postcode:
-
Scope of Works:
-
Person in Charge of Works:
-
Other Team Members:
Audit Questions
-
Main Activity:
-
Sub Activity:
INSTALLATION
-
Has the work been completed as per client specification documents?
-
Has the work been completed in line with the requirements of BS7671?
-
Is the installation generally tidy and acceptable?
-
Are circuits and equipment labelled satisfactorily?
-
Are terminations tight?
-
Has the correct sleeving been used where appropriate?
-
Have circuit breakers of the correct type and rating been used?
-
Have the correct glands been used, with shrouds fitted?
-
Have banjos and fly leads been connected where appropriate?
-
Are glands tight and secure?
-
Have cables been adequately secured throughout?
-
Have ducts been filled where appropriate?
-
Has the correct type of cable been used?
-
Have cable tie tails been cut flush?
-
Has an RCD been used where required?
-
Have exposed metal crimps had heat shrink applied?
-
Has all earthing been completed satisfactory?
-
Has the structural earth been connected and checked?
-
Are all cables installed using appropriate bootlace crimps?
-
Has the site been left safe and tidy, with all waste generated by 8Point8 works removed?
TESTING AND INSPECTION
-
Has the correct installation / DC certificate been completed?
-
Have the correct details been completed on the certificate as appropriate?
-
Do the test readings listed concur with readings on site?
-
Has the correct earthing / supply system been identified?
ADDITIONAL INFORMATION
-
Is there any other quality issues on site not yet identified by this audit?
INSTALLATION
-
Has the work been completed as per client specification documents?
-
Has the work been completed in line with the requirements of BS7671?
-
Is the installation generally tidy and acceptable?
-
Are circuits and equipment labelled satisfactorily?
-
Are terminations tight?
-
Has the correct sleeving been used where appropriate?
-
Have circuit breakers of the correct type and rating been used?
-
Have the correct glands been used, with shrouds fitted?
-
Have banjos and fly leads been connected where appropriate?
-
Are glands tight and secure?
-
Have cables been adequately secured throughout?
-
Have ducts been filled where appropriate?
-
Has the correct type of cable been used?
-
Have cable tie tails been cut flush?
-
Has an RCD been used where required?
-
Have exposed metal crimps had heat shrink applied?
-
Has all earthing been completed satisfactory?
-
Has the structural earth been connected and checked?
-
Has the screen been energised and working correctly?
-
Has the site been left safe and tidy, with all waste generated by 8Point8 works removed?
TESTING AND INSPECTION
-
Has the correct installation / minor works certificate been completed?
-
Have the correct details been completed on the certificate as appropriate?
-
Do the test readings listed concur with readings on site?
-
Has the correct earthing / supply system been identified?
ADDITIONAL INFORMATION
-
Is there any other quality issues on site not yet identified by this audit?
INSTALLATION
-
Has the work been completed as per client specification documents?
-
Has the work been completed in line with the requirements of BS7671?
-
Is the installation generally tidy and acceptable?
-
Are terminations tight?
-
Has the correct sleeving been used where appropriate?
-
Have circuit breakers of the correct type and rating been used?
-
Have the correct glands been used, with shrouds fitted?
-
Have banjos and fly leads been connected where appropriate?
-
Are glands tight and secure?
-
Have cables been adequately secured throughout?
-
Has the correct type of cable been used?
-
Have cable tie tails been cut flush?
-
Has an RCD been used where required?
-
Have exposed metal crimps had heat shrink applied?
-
Has all earthing been completed satisfactory?
-
Are the cable stanchions secured correctly and positioned as per plans?
-
Are all cable stanchions marked with warning tape around each leg?
-
Is all cable containment installed as per plans?
-
Is all cable containment fastened and secured to stanchions?
-
Are all containment and stanchions cross bonded to earth?
-
Are the cabin and generator positioned as shown on plans?
-
Has the generator been started and checked for correct operation?
-
Are the cabin doors opening correctly now sited in position?
-
Are all the batteries within the cab secured?
-
Are all the battery connections tight?
-
Are all the bottom trims installed around the cab correctly?
-
Are the cab steps installed and fixed down correctly?
-
Are all guards installed around the cab?
-
Is the exhaust from the generator fitted and sealed?
-
Are the air input ducts to the air con installed correctly?
-
Are the external grilles to the ducts installed correctly?
-
Has the intruder alarm been installed as per drawings?
-
Has the fire alarm been installed as per drawings?
-
Has the door entry system been installed as per drawings?
-
Have the air conditioning isolators been installed and connected as per plans?
-
Have the air conditioning condenser cables been installed and connected satisfactorily?
-
Has the inside of the cab been left in a neat and tidy condition?
-
Has the area been left in a neat and tidy condition?
-
Are all cable tags installed and clearly marked?
-
Has the site been left safe and tidy, with all waste generated by 8Point8 works removed?
TESTING AND INSPECTION
-
Has the correct installation / minor works certificate been completed?
-
Have the correct details been completed on the certificate as appropriate?
-
Do the test readings listed concur with readings on site?
-
Has the correct earthing / supply system been identified?
ADDITIONAL INFORMATION
-
Is there any other quality issues on site not yet identified by this audit?
INSTALLATION
-
Is there a separate fire alarm system installed? (not combined with intruder alarm)
-
Has the work been carried out as per instruction from client?
-
Has the work been carried out to BS5389- part 1?
-
Is the panel showing healthy with no faults?
-
Has the panel got the correct fire isolation switch installed?
-
Is the installation wired in Red FP200 or fireproof cabling?
-
Are there sufficient smoke / heat detectors installed?
-
Does the installation contain a minimum of 2 sounders?
-
Is there a manual call point installed?
-
Is the system linked to the landlords system?
-
Is the mains supply correctly identified within the distribution board?
-
Are all warning / advisory notices installed?
-
Are all cables installed neatly with sufficient support? (EG metal tie wraps or P clips)
-
Have any cable ties been cut flush?
-
Are all cables glanded into devices satisfactorily?
-
Are the glands tight and secure?
-
Is the installation generally tidy and acceptable?
-
Has the site been cleared of all waste generated by the installation?
TESTING AND INSPECTION
-
Has the HOP been completed and on i-auditor?
-
Has the NICEIC design certificate been issued?
-
Has the NICEIC installation certificate been issued?
-
Has the NICEIC commissioning certificate been issued?
-
Are the certificates completed correctly as per BS5389 Part 1?
ADDITIONAL INFORMATION
-
Are there any other quality issues relating to this site? (describe below)
-
Sub Activity:
-
Build Stage:
ACCESS
-
Does the site have adequate barriers and signage?
-
Is there vehicle parking on site?
-
Does the site require track way?
IN BUILD (LAND BASED)
-
Has the foundations been set out correctly as per drawing?
-
Are foundations dug to the correct dimensions?
-
Are the foundations in a safe condition?
-
Has the re bar been installed as per design drawing?
-
Is the HD kit installed as per specification?
-
Is the HD kit secure and bolts taped up prior to pour?
-
Is the LP tape installed as per the specification?
-
Are the ducts installed?
-
Have draw cords been installed into each duct?
-
Are LP pits installed and concreted in situ?
-
Has the concrete been vibrated during pour? (picture required)
-
Confirm finish to concrete - brushed - buried - trowel edge?
-
Are the cabinet roots set as per drawing?
-
Cabinet LP correct?
IN BUILD (GABLE)
-
Has the wall battens been set out correctly?
-
Confirm embedment depth as per drawing?
-
Have all anchors been pull tested? (confirm test requirement)
-
Confirm amount of packing to the battens?
-
Are all wall fixing centre of brick?
-
Is the mounting beam installed correctly?
-
Are all steels plumb and level?
ACCESS
-
Has Trakway/ track panels been used for the installation, if so has the ground been reinstated correctly?
-
Are access ramps / paths installed as per drawings?
-
Have the hard standings been installed to the clients requirements?
-
Are the finishes to the hard standings as per specifications?
BUILD
-
Is the installation complete?
ELECTRICAL / LP INSTALLATION
-
Has the power supply been connected in the feeder pillar?
-
Is the earthing in the meter cabinet as per specification?
-
Has the submain cable been installed correctly with sufficient clips / tags?
-
Is all necessary electrical labelling in place?
-
Is the earthing arrangements in the meter cabinet correct?
-
Are the correct number of LP pits installed?
-
Are connections to the feeder pillar steelwork Denso taped?
-
Has the NICEIC 18th Edition testing been completed?
-
If applicable, has the lighting been installed?
STEELWORK
-
Is the steelwork plumb and level?
-
Are double nuts installed correctly? (if required)
-
Do we have min 5mm thread protruding once all nuts are installed?
-
Are all fixings taught and secure?
-
Are the HD bolts Denso taped?
-
Have all paint defects been rectified?
-
Has the LP been tested to <10 ohms?
SCREEN INSTALLATION
-
Has the screen been installed with all double nuts in place?
-
Are all mounting beam fixings in place?
-
Are all head restraints applied and taught? (if required)
-
Have the base cladding brackets been set?
-
If powered up are there any hot / cold seams?
CABINETS
-
Are cabinets in the correct orientation as per drawing?
-
Are cabinets the correct colour?
-
Has the internal cabinet been sealed? (EG bitumen)
-
Have all fixings been installed in the root?
CLADDING INSTALLATION
-
Has the cladding been installed correctly?
-
Is the cladding installed with the correct gaps / joint connections / flexi foam?
-
Cladding Type:
-
Are all joints 3mm or less?
-
Are all joints lined and plumb?
-
Are corners square?
-
Are soffits level?
-
Are face fixed cladding fixings PPC coated to the correct RAL No?
-
Are the internal fixing taught and in line?
-
Are the cladding fixings back to subframe installed?
-
Has all cladding been cleaned down satisfactorily?
ACCESS
-
Has Trackway / track panels been used for the decommission, if so has the ground been reinstated correctly?
CIVILS
-
Has the power supply been disconnected in the feeder pillar?
-
Is the isolation tagged and dated?
-
Has the submain cable been removed completely including removal of cable fixings?
-
If applicable, has the lighting been removed?
-
Has the sign been fully removed?
-
Have all redundant fixings been removed?
-
If instructed, has the gable end been repainted to match the existing colour?
-
For land based signs, have all posts been cut back flush with ground level?
-
If instructed, have all bases been broken out below ground level?
-
For any areas disturbed, is the topsoil reinstatement adequate?
-
Has the reinstatement been reseeded?
-
Has the existing fence line been reinstated?
-
Does the new fencing match the existing?
-
Has the fence been erected plumb?
-
Has the fence been painted to match the existing?
-
Is the existing site now secure?
-
Has all the rubbish been removed from site?
-
Has the TM been removed from site?
-
Has all hired in plant been removed from site?
HANDOVER
-
Are before / during and after photos available?
ADDITIONAL INFORMATION
-
Are there any additional quality issues on site that have not yet been identified as part of this audit?
-
Build Phase:
-
-
POLE
-
Is the pole hatch correctly orientated? (compass check from auditor along with photo)
-
Is the pole inspection cover installed and secure?
CABINET(S)
-
Do all cabinet doors open and lock, and is the cabinet level?
-
Is the cabinet root installed as per specification? (sealed round the edges etc)
-
Have holding down bolts for the cabinet been evenly spaced out as per design specification?
-
Has bitumen seal been applied onto the concrete?
-
Is the cabinet clean and the plinth wiped clear of any concrete splashes?
-
Are all cab doors locked and secure?
DUCTING
-
Have 2 blue draw cords been installed in each duct as per specification?
-
Are all ducts cut flush as per specification?
-
Are all feeder ducts 150mm and smooth wall?
-
Are all remote fibre ducts 100mm and smooth wall?
-
Are all interconnecting ducts min 75mm and smooth wall?
OTHER
-
Are earthing connections correctly fitted and inhibitor contact paste applied?
-
Are all reinstatement works completed to an acceptable standard?
-
Have the lifting brackets been removed?
-
Has all correct site signage been installed as per client specification? (5 in total)
-
Are there any remaining HSE issues on site? (EG trip hazards, waste materials, uncollected plant or materials etc.)
ADDITIONAL INFORMATION
-
Are there any additional quality issues on site that have not yet been identified as part of this audit?
ACCESS
-
Has Trakway / track panels been used for the installation, if so has the ground been reinstated correctly?
-
Are access ramps / paths installed as per drawings?
-
Have the hard standings been installed to the clients requirements?
-
Are the finishes to the hard standings as per specifications?
ELECTRICAL / LP
-
Has the power supply been connected in the feeder pillar?
-
Is the earthing in the meter cabinet as per specification?
-
Has the submain cable been installed correctly with sufficient clips / tags?
-
Is all necessary electrical labelling in place?
-
Is the earthing arrangements in the meter cabinet correct?
-
Are the correct number of LP pits installed?
-
Are connections to the feeder pillar steelwork Denso taped?
-
Has the NICEIC 18th Edition testing been completed?
-
If applicable, has the lighting been installed?
BUILD
-
Is the installation of the sign complete?
-
Is the steelwork erected as per the detailed design drawings?
-
Are the holding down bolts Denso taped?
-
Are the cladding works complete?
-
Are there any paint defects visible on the steelwork?
-
Is the cladding completed to an acceptable standard- gaps, joints sealant etc?
-
Are all visible cladding fixings colour capped?
-
Are displays live?
-
If digital screens are installed, are they aligned correctly?
-
If light boxes have been installed, are the vinyl skins tightened sufficiently?
-
Has the screen and cladding been cleaned of all dust / watermarks?
-
Are all external cabinets in place?
-
Are all external cabinets painted the correct colour?
-
For any areas disturbed, is the topsoil reinstatement adequate?
-
Has the reinstatement been reseeded?
-
If new fencing is installed, does the new fencing match the existing?
-
Has the fence been erected plumb?
-
Has the fence been painted to match the existing?
-
Have ground base cabs been levelled and grouted?
-
Are the cabs accessible with no obvious hazards?
-
Has the trunking to the screen been correctly installed?
-
Has all the fixings been double nutted / licking nut installed?
-
Has the branding bar been installed and is it visible over the fence line?
-
Has all the rubbish been removed from site, including rubbish from the installation of the screens?
-
Has the Traffic Management been removed from site?
-
Has all hired in plant been removed from site?
HANDOVER
-
Are before / during and after photos available?
Site Photos
-
Site Photos