Title Page
-
Depot
-
Date Audit Conducted
-
Depot Responsible Person
-
Prepared by
Process - STR
-
Auditee
-
Number of STR trucks on STR fleet?
-
Number of STR trucks currently on site?
-
STR sample pack 1
-
Customer Name
-
Truck Number
-
Hire Agreement Number
-
STR Log completed (add log number in notes)
-
QMS01 Enquiry Form completed (add image)
-
QMS02 Credit application form completed (only for new customers not existing)
-
QMS03 Signed Prep Sheet (add image)
-
QMS19 Site Survey completed (only for new customers not existing)
-
QMS76 STR Checklist completed and signed by both parties (add image)
-
QMS79 or Autoline off hire notification number
-
GRN Number
-
In date Hired in Plant insurance certificate (add image)
-
In date LOLER Certificate (add image)
-
Signed transport POD out (QMS47) (add image)
-
Signed transport POD in (QMS47) (add image)
-
Signed STR Hire Agreement (add image)
undefined
-
STR Sample Pack 2
-
Customer Name
-
Truck Number
-
Hire Agreement Number
-
STR Log completed (add log number in notes)
-
QMS01 Enquiry Form completed (add image)
-
QMS02 Credit application form completed (only for new customers not existing)
-
QMS03 signed prep sheet (add image)
-
QMS19 Site Survey completed (only for new customers not existing)
-
QMS76 STR checklist completed and signed by both parties (add image)
-
QMS79 or Autoline STR off hire notification number
-
GRN Number
-
In date Hired in Plant insurance certificate (add image)
-
In date LOLER Certificate (add image)
-
Signed transport POD out (QMS47) (add image)
-
Signed transport POD in (QMS47) (add image)
- Yes
- No
-
Signed STR Agreement (add image)
Buy Back Process
-
Sample 1
-
Has latest version of QMS08 been used (add image)
-
Truck Number
-
Buy Back Dated
-
All relevant boxes completed (in top half of form)
-
Picture of truck attached
-
Term box selected (1-7)
-
Rental Controller Signed and Dated
-
Depot Manager Signed and Dated
-
Sample 2
-
Has latest version of QMS08 been used (add image)
-
Truck Number
-
Buy Back Dated
-
All relevant boxes completed (in top half of form)
-
Picture of truck attached
-
Term box selected
-
Rental Controller Signed and Dated
-
Depot Manager Signed and Dated
-
Sample 3
-
Has latest version of QMS08 been used (add image)
-
Truck Number
-
Buy Back Dated
-
All relevant boxes completed (in top half of form)
-
Picture of truck attached
-
Term box selected (1-7)
-
Rental Controller Signed and Dated
-
Depot Manager Signed and Dated
STR Stock Take
-
STR Stock Take Completed (add month in notes)
-
QMS59 Stock Take Form completed and Signed by Counter and STR Controller (add image)
-
QMS58 Stock Take Discrepancy Form completed
Thorough Examination (TE's) Reviewed
-
Sample 1
-
Name of Engineer / company (SI) that completed the TE
-
Record Number / Certificate Number (add image)
-
Examination Date
-
Are all 'Details of Equipment' completed
-
Sample 2
-
Name of Engineer / company (SI) that completed the TE
-
Record Number / Certificate Number (add image)
-
Examination Date
-
Are all 'Details of Equipment' completed
-
Sample 3
-
Name of Engineer / company (SI) that completed the TE
-
Record Number / Certificate Number (add image)
-
Examination Date
-
Are all 'Details of Equipment' completed
GRN
-
Sample 1
-
GRN / WIP Number
-
Dated
-
Is GRN fully completed
-
Sample 2
-
GRN / WIP Number
-
Dated
-
Is GRN fully completed
-
Sample 3
-
GRN / WIP Number
-
Dated
-
Is GRN fully completed
Process - Service
-
Auditee
-
Total Number of Engineers
-
Number of Overdue Services
Service Records Review
-
Sample 1
-
Fleet Number
-
Customer
-
WIP Number
-
Date
-
Engineer
-
Technician Notes completed and relevant
-
PTA Completed (if no add note)
-
SSRA Completed (if no add note)
-
4 approval photos (including hour metre reading & capacity plate)
-
Is service status 'Complete'
-
Signed by Customer (add customer name in notes)
-
Sample 2
-
Fleet Number
-
Customer
-
WIP Number
-
Date
-
Engineer
-
Technician Notes completed and relevant
-
PTA completed (if no add notes)
-
SSRA completed (if no add notes)
-
4 approval photos (including hour metre reading and capacity plate)
-
Is service status 'Complete'
-
Signed by customer (add name in notes)
-
Sample 3
-
Fleet Number
-
Customer
-
WIP Number
-
Date
-
Engineer
-
Technician notes completed and relevant
-
PTA completed (if no add note)
-
SSRA completed (if no add note)
-
4 approval photos (including hour metre reading & capacity plate)
-
Is service status 'Complete'
-
Signed by customer (add name in notes)
Break Down Records Review
-
Sample 1
-
Fleet Number
-
Customer
-
WIP
-
Date
-
Engineer
-
Reason of break down / issue
-
Technician notes completed and relevant
-
PTA completed (if no add note)
-
SSRA completed (if no add note)
-
4 approval photos (including hour metre reading & capacity plate)
-
Signed by customer (Add name in notes)
-
Does the customer have an SLA / response time (if yes was the response time met)
-
Sample 2
-
Fleet Number
-
Customer
-
WIP
-
Date
-
Engineer
-
Reason for break down / issue
-
Technician notes completed and relevant
-
PTA completed (if no add note)
-
SSRA completed (if no add note)
-
4 approval photos (including hour metre reading & capacity plate)
-
Signed by customer (add name to notes)
-
Does the customer have an SLA / response time (if yes was the response time met)
-
Sample 3
-
Fleet Number
-
Customer
-
WIP
-
Date
-
Engineer
-
Reason for break down / issue
-
Technician notes completed and relevant
-
PTA completed (if no add note)
-
SSRA completed (if no add note)
-
4 approval photos (including hour metre reading & capacity plate)
-
Signed by customer (add name to notes)
-
Does the customer have an SLA / response time (if yes was the response time met)
Engineer Van Checks
-
Sample 1
-
Engineer Name
-
Van Registration
-
Date of check
-
Was the vehicle safe to drive (add notes if applicable)
-
Approval photos (add notes if applicable)
-
Sample 2
-
Engineer Name
-
Van Registration
-
Date of check
-
Was the van safe to drive (add notes if applicable)
-
Approval photos (add notes if applicable)
-
Sample 3
-
Engineer Name
-
Van Registration
-
Date of check
-
Was the van safe to drive (add notes if applicable)
-
Approval photos (add notes if applicable)
Engineer Ladder Checks
-
Sample 1
-
Engineer
-
Date of check
-
Ladder ID
-
Was the ladder safe to use
-
Approval photo
-
Sample 2
-
Engineer
-
Date of check
-
Ladder ID
-
Was the ladder safe to use
-
Approval photo
-
Sample 3
-
Engineer
-
Date of check
-
Ladder ID
-
Was the ladder safe to use
-
Approval photo
Process - Parts
-
Auditee
-
Engineer requests part through RT Parts - is process compliant (add notes)
-
CAT Order - is process compliant (add notes)
-
Ordering a part on TVH or other supplier portal - is process compliant (add notes)
Process - Training & Communication - Depot Manager
-
Auditee
-
Are Engineer Supervisory Report being completed
-
Sample 1
-
Engineer Name
-
Name of senior engineer completing the report
-
Date report completed
-
Sample 2
-
Engineer Name
-
Name of senior engineer completing report
-
Date report completed
-
Sample 3
-
Engineer Name
-
Name of senior engineer completing report
-
Date report completed
Training Course Summary
-
Do you have visibility of the training matrix on Teams
-
Sample 1
-
Engineer Name
-
Are the above engineers compulsory courses all in date
-
Risk Assessment Course Date
-
Manual Handling Course Date
-
Working at Height Course Date
-
Jacking & Blocking Course Date
-
Routine Maintenance Course Date
-
Abrasive Wheel Course Date
-
Lifting & Slinging Course Date
-
Driver Training B1
-
Driver Training A1
-
Driver Training D1
-
Sample 2
-
Engineer Name
-
Are the above engineers compulsary courses all in date
-
Risk Assessment Course Date
-
Manual Handling Course Date
-
Working at Height Course Date
-
Jacking & Blocking Course Date
-
Routine Maintenance Course Date
-
Abrasive Wheel Course Date
-
Lifting & Slinging Course Date
-
Driver Training B1
-
Driver Training A1
-
Driver Training D1
-
Sample 3
-
Engineer Name
-
Are the above engineers compulsory courses all in date
-
Risk Assessment Course Date
-
Manual Handling Course Date
-
Working at Height Course Date
-
Jacking & Blocking Course Date
-
Routine Maintenance Course Date
-
Abrasive Wheel Course Date
-
Lifting & Slinging Course Date
-
Driver Training B1 Course Date
-
Driver Training A1 Course Date
-
Driver Training D1 Course Date
Tool Box Talks & Safety Bulletins
-
Sample 1
-
Tool Box Talk name
-
Engineer Name
-
Date Tool Box Talk completed
-
Sample 2
-
Tool Box Talk name
-
Engineer Name
-
Date Tool Box Talk completed
-
Sample 3
-
Tool Box Talk name
-
Engineer Name
-
Date Tool Box Talk completed
RAMS & COSHH Acknowledgements (current year)
-
Have all your members of staff acknowledged their RAMS on 360 learning
-
Have all your members of staff acknowledged their COSHH on 360 learning
Process - Equipment Inspection & Test - Depot Manager
-
When was your last Tek-Cal Inspection
-
Is your current Tek-Cal colour code poster displayed in the depot (add where to notes)
-
What colour tags are currently being used in the workshop for lifting equipment
-
Ladder Inspections
-
LOLER Inspections
-
Fall Arrest Inspections
-
Load Test Inspections
-
Van Weights
-