Title Page

Audit Details

  • Installation completed on:

  • Auditor Name:

  • Inspection conducted on:

Project Details

  • Workstream:

  • Client:

  • Project Manager:

  • Site No and Name:

  • Site Postcode:

  • Site Type:

  • Scope of Works as detailed on HOP:

  • Person in Charge of Works:

  • Other Team Members:

1. Audit Questions

  • Project:

Build

  • Have build works been carried out?

  • Has the structure been installed and aligned as per design drawings?

  • Has the anticlimb been installed to specification, and is it secure?

  • Has the fall arrest system been correctly installed according to safety specifications? (e.g. fixing elements, connection screws, cable cut correctly, plate spinning correctly, etc..)

  • Has the fall arrest system information plate been correctly stamped? (e.g. showing site number

  • Has the lightning protection for this site been correctly installed or reattached?

  • Has the cable management been installed correctly as per drawings?

  • If pull testing was part of the scope of works, has this been carried out to the required standard and evidenced in the HOP photos?

  • If a streetworks pole has been installed have the nuts been torqued correctly and evidenced in the HOP photos?

  • If installation of additional steelwork was part of the scope of works, has this been installed as per design drawings and correctly connected to the LP system?

Antennas

  • Have antennas been installed as part of the works?

  • Is the antenna the correct type as per the SCF/SDR/RDS/design drawings?

  • Do the mechanical/electrical tilts and bearings match those specified in the SCF/SDR/RDS/design drawings?

  • Are the antennas installed at the correct level (vertical/mid-point alignment) and face aligned to avoid shadowing/clipping?

  • Have the tilt brackets been installed correctly?

  • Have safety lanyards been installed correctly as per spec? (VFUK)

  • Has the Smart Bias T been installed correctly and on the correct port?

  • Have the RET leads been installed correctly?

  • Has the engineer saved the RET report correctly?

  • Are the RF warning stickers installed on all antennas as per spec?

  • Are all unused antenna ports capped?

  • Are all RF tails connected to correct ports?

Weatherproofing

  • Has weatherproofing been installed as part of the works?

  • Is the enough self amalgamating tape on the connectors?

  • Has the full connector been covered, including the heat shrink on factory made tails?

  • is the outer layer of tape tight and tidy with no flags?

Tagging

  • Has tagging and labelling been installed as part of the works?

  • Have the correct tags been installed as per spec?

  • Are all tags correctly secured?

  • Are all tags properly printed, clearly readable, and not hand written?

  • Are all cable ties cut flush?

Cable Management

  • Has cable management been installed as part of the works?

  • Is there the correct distance between studs?

  • Are there drip loops at the gland where required in spec?

  • Are there any visible defects with the gland (e.g. more than one cable per Roxtec module, visible air gaps, open glands/missing modules, etc)?

  • Have the correct size clamps been used?

  • Is there 20mm max / 2mm min left on studs?

  • Has a flat and a spring been added to all studs?

  • Where studs have been cut, have end caps been installed?

  • Is the bend radius correct as per manufacturers specification?

  • Has the engineer avoided the cables being crossed?

  • Has the engineer straightened the cables?

  • Is the correct cable management installed?

  • Have unused cables been capped at cab end/demarcation point?

  • Are the feeders terminated to the correct demarcation point?

  • Has the GPS cable been terminated correctly and presented in the correct position as per spec?

  • Have fibres been run to the correct location and are unused fibres capped, coiled, and stored correctly?

Cable Earthing

  • Has cable earthing been installed as part of the works?

  • Are there the correct number of earths for the length and route of the cables as per spec?

  • Has contact paste been applied to all stainless to copper/galvanised connections?

  • Have the earths been installed as per spec?

  • Have the earth tails been installed as straight as possible?

RRU/RRH/ERS/Combiner/MHA etc

  • Have RRUs/ERSs/RRHs/Combiners/MHAs/etc been installed as part of the works?

  • Are all units correctly earthed as per spec?

  • Have all units been installed correctly as per manufacturers guidance?

  • Have all units been installed in the correct positions set out in the design drawings?

  • If unistrut has been used for mounting equipment, have end caps been installed? (subject to spec)

  • Have the RF jumpers been connected to the correct ports?

  • Have the fibre jumpers been connected correctly?

  • If BOBs have been installed, are the internal cable management and fibre/DC connections correct?

Site Conditions

  • Has the site been left secure?

  • Has the site been left tidy with all waste removed?

  • Has a 'Paragraph 18' notice been installed and visible to the public?

  • Have any cable glands/roxtec/tray covers/etc been installed correctly?

  • Have all ducts been sealed with expanding foam?

  • Have the correct photos of the installation been taken and submitted for the HOP?

Additional Comments

  • Are there any additional quality issues on site which have not yet been identified as part of this audit?

2. Site Photos

  • Site Photos

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.