Slab Pre Pour.
-
Are all safety rails in place and at proper height ?
-
Are ladders placed for proper egress during and after slab pour ?
-
Has slab elevation been verified by field engineer?
-
Are all kickers installed and nailed on edge forms ?
-
Have edgeforms been aligned with a string line ?
-
Is the condition of the plywood on tables and fillers acceptable for exposed ceilings ?
-
Is chamfer installed in all required locations ?
-
Does edge form line up with the top of columns from floor below ?
Balconies
-
Is drip strip installed correctly ?
-
Is curb installed at correct height and width ?
-
Is depression installed straight and secured from movement ?
-
Is all Formwork on balconies in good condition ?
Slab pre pour. Pour A
-
Have all items above been checked for slab pour 1? If no explain below
Slab pre pour. Pour B
-
Have all items above been checked for slab pour 2? If no explain below
Slab pre pour. Pour C
-
Have all items above been checked for slab pour 3 ? If no explain below
Post Pour
-
Has concrete leakage on floor, around columns and walls been removed and disposed of?
-
Has concrete seepage from slab bulkhead been removed before it sets up ?
Slab post pour. Pour A
-
Have all items above been checked for slab pour 1? If no explain below
Slab post pour. Pour B
-
Have all items above been checked for slab pour 2 ? If no explain below
Slab post pour. Pour C
-
Have all items above been checked for slab pour 3 ? If no explain below
Vertical pre pour
-
Do new control lines match with previous pour slab edges and floor openings ?
-
Are exterior columns plumb and line up with slab edge and columns below ?
-
Has Grade in forms been checked ?
-
Are Dummy ties installed correctly and secured to prevent movement ?
-
Are reveals installed correctly and secured to prevent movement ?
-
Have all forms been checked for proper bolts, pins, clamps and braces ?
Vertical post pour
-
Have all columns been rechecked for plumb after concrete placement?
-
Have walls been rechecked for plumb and realigned with string line after concrete placement ?
-
Is all remedial work on outside face of exterior columns done while the deck is in place ?
-
Have all chamfer strips and fins been removed from columns after stripping ?
-
Was concrete seepage under forms removed as soon as forms were stripped?
Vertical post pour. Pour A
-
Have all items above on pour 1 vertical been checked ? If not explain below.
Vertical post pour. Pour B
-
Have all items above on pour 2 vertical been checked ? If not explain below.
Vertical post pour. Pour C
-
Have all items above on pour 3 vertical been checked ? If not explain below.
Reshore floors
-
Are all permanent safety rails, hole covers (labeled) and ladders reinstalled properly?
-
Is all trash and formwork debris been consolidated and ready for removal ?
-
Have all wood splinters nails and concrete fins been removed from ceiling ?
-
Is all SPS work complete on this level ?
-
Are all Reshores removed ?
-
Is all SPS material removed from floor ?
-
Is the condition of forms providing a concrete finish that is acceptable in exposed areas ?
-
Is floor clean and swept ?
-
Is floor signed off by General Contractor ?
-
When all items are complete and signed off by GC for this level save and export to qc@southernpan.com