Plastering
Prepare and plan
-
Confirm Specification
-
Confirm Drawing
Aplly and Control
-
Check the area is clean before commencement and access restricted for through traffic.
-
Any dubbing out agreed prior to start.
-
Check surfaces clean, the key/surface preparation is acceptable, the bonding agent is as specified and all first fix items e.g. electric boxes are installed
-
Check ambient temperature is within specified limits
-
Check adequate lighting to enable task to be completed
-
Check that Windows and cills are protected against damage and plaster splatter.
-
Check angles, reveals and beads for margins, levels and plumb
-
Check that the surfaces are flat, level and plumb
-
Check ceiling lines and reveals to openings and windows and ensure they are level and plumb
-
Check the plaster is finished at correct line at ceiling and skirting levels
-
Check reinforcement has been applied over joints or changes in background materials - particular attention to be paid to door jambs and expansion joints.
-
Check finished coat thickness is correct and is trowelled smooth and consistent, with no bubbles or trowel lines and is finished to specified tolerances.
Complete For Quality
-
Works adequately protected
-
Work area cleaned
-
Manager Signature
-
Date closed