Internal Quality Audit

Drawing Register

  • How are the latest drawings on site been sourced

Pads and Foundations

  • Are checks been made on site to make sure latest drawing is been used<br>

  • Is there a marked up drawing in site office which reflexes QA been undertaken on site

  • Are QA forms been completed to satisfaction and all information required filled in

  • Is the Principal contractor signing off QA

  • Are standards of workmanship on site as per specifications and drawings

Retaining wall bases

  • Are checks been made on site to make sure latest drawing is been used

  • Is there a marked up drawing in site office which reflexes QA been undertaken on site

  • Are QA forms been completed to satisfaction and all information required filled in

  • Is the Principal contractor signing off QA

  • Are standards of workmanship on site as per specifications and drawings

Retaining walls

  • Are checks been made on site to make sure latest drawing is been used

  • Is there a marked up drawing in site office which reflexes QA been undertaken on site

  • Are QA forms been completed to satisfaction and all information required filled in

  • Is the Principal contractor signing off QA

  • Are standards of workmanship on site as per specifications and drawings

Ground Floor Slab

  • Are checks been made on site to make sure latest drawing is been used

  • Is there a marked up drawing in site office which reflexes QA been undertaken on site

  • Are QA forms been completed to satisfaction and all information required filled in

  • Is the Principal contractor signing off QA

  • Are standards of workmanship on site as per specifications and drawings

Suspended Slabs

  • Are checks been made on site to make sure latest drawing is been used

  • Is there a marked up drawing in site office which reflexes QA been undertaken on site

  • Are QA forms been completed to satisfaction and all information required filled in

  • Is the Principal contractor signing off QA

  • Are standards of workmanship on site as per specifications and drawings

Bolts

  • Are checks been made on site to make sure latest drawing is been used

  • Is there a marked up drawing in site office which reflexes QA been undertaken on site

  • Are QA forms been completed to satisfaction and all information required filled in

  • Is the Principal contractor signing off QA

  • Are standards of workmanship on site as per specifications and drawings

Grouting

  • Are checks been made on site to make sure latest drawing is been used

  • Is there a marked up drawing in site office which reflexes QA been undertaken on site

  • Are QA forms been completed to satisfaction and all information required filled in

  • Is the Principal contractor signing off QA

  • Are standards of workmanship on site as per specifications and drawings

Column Encasing

  • Are checks been made on site to make sure latest drawing is been used

  • Is there a marked up drawing in site office which reflexes QA been undertaken on site

  • Are QA forms been completed to satisfaction and all information required filled in

  • Is the Principal contractor signing off QA

  • Are standards of workmanship on site as per specifications and drawings

Below Ground Services

  • Are checks been made on site to make sure latest drawing is been used

  • Is there a marked up drawing in site office which reflexes QA been undertaken on site

  • Are QA forms been completed to satisfaction and all information required filled in

  • Is the Principal contractor signing off QA

  • Are standards of workmanship on site as per specifications and drawings

Foul & Surface inclusive of slab drainage

  • Are checks been made on site to make sure latest drawing is been used

  • Is there a marked up drawing in site office which reflexes QA been undertaken on site

  • Are QA forms been completed to satisfaction and all information required filled in

  • Is the Principal contractor signing off QA

  • Are standards of workmanship on site as per specifications and drawings

Manhole Inspection

  • Are checks been made on site to make sure latest drawing is been used

  • Is there a marked up drawing in site office which reflexes QA been undertaken on site

  • Are QA forms been completed to satisfaction and all information required filled in

  • Is the Principal contractor signing off QA

  • Are standards of workmanship on site as per specifications and drawings

Installation of storm water holding tanks and petrol interceptors

  • Are checks been made on site to make sure latest drawing is been used

  • Is there a marked up drawing in site office which reflexes QA been undertaken on site

  • Are QA forms been completed to satisfaction and all information required filled in

  • Is the Principal contractor signing off QA

Catch Pit and Land drain

  • Are checks been made on site to make sure latest drawing is been used

  • Is there a marked up drawing in site office which reflexes QA been undertaken on site

  • Are QA forms been completed to satisfaction and all information required filled in

  • Is the Principal contractor signing off QA

  • Are standards of workmanship on site as per specifications and drawings

Brick and Block work

  • Are checks been made on site to make sure latest drawing is been used

  • Is there a marked up drawing in site office which reflexes QA been undertaken on site

  • Are QA forms been completed to satisfaction and all information required filled in

  • Is the Principal contractor signing off QA

  • Are standards of workmanship on site as per specifications and drawings

Bulk Excavation

  • Are checks been made on site to make sure latest drawing is been used

  • Is there a marked up drawing in site office which reflexes QA been undertaken on site

  • Are QA forms been completed to satisfaction and all information required filled in

  • Is the Principal contractor signing off QA

  • Are standards of workmanship on site as per specifications and drawings

Kerbs and Edgings

  • Are checks been made on site to make sure latest drawing is been used

  • Is there a marked up drawing in site office which reflexes QA been undertaken on site

  • Are QA forms been completed to satisfaction and all information required filled in

  • Is the Principal contractor signing off QA

  • Are standards of workmanship on site as per specifications and drawings

Flags and Block paving

  • Are checks been made on site to make sure latest drawing is been used

  • Is there a marked up drawing in site office which reflexes QA been undertaken on site

  • Are QA forms been completed to satisfaction and all information required filled in

  • Is the Principal contractor signing off QA

  • Are standards of workmanship on site as per specifications and drawings

Roads and Paths

  • Are checks been made on site to make sure latest drawing is been used

  • Is there a marked up drawing in site office which reflexes QA been undertaken on site

  • Are QA forms been completed to satisfaction and all information required filled in

  • Is the Principal contractor signing off QA

  • Are standards of workmanship on site as per specifications and drawings

Asphalt

  • Are checks been made on site to make sure latest drawing is been used

  • Is there a marked up drawing in site office which reflexes QA been undertaken on site

  • Are QA forms been completed to satisfaction and all information required filled in

  • Is the Principal contractor signing off QA

  • Are standards of workmanship on site as per specifications and drawings

Procedures

Concrete cube making and results

  • Has there been a operative designated for this task

  • Are the results within tolerance

  • Are the cubes been stored correctly

Non-conformance from Principal Contractor

  • Has any NCR's been raised

  • Have all NCR been closed

Close out and sign off

Close out

  • Has the last report been closed out

Site signatures

  • Auditor name and signature

  • Site Managers name and signature

  • Engineers name and signature

Close out of audit

  • Actions to be closed out<br>1. <br><br>2.<br><br>3.<br><br>4.<br><br>5.<br><br>6.<br><br>7.<br><br>8.<br><br>9.<br><br>10.<br><br>

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.