Information

  • Site number

  • Location
  • Conducted on

  • Conducted by

General

General

  • Is the site safe and tidy?

  • Do all operatives hold a CSCS/ECS card with appropriate qualifications?

  • Do all operatives have appropriately PPE for the tasks being carried out?

  • Does all electrical equipment being used have in date PAT test?

  • Does all applicable equipment have in date calibration certificates?

  • Are all storage facilities appropriately managed?

  • Are all relevant risk assessments/method statements available on site?

  • Has daily briefing/risk focused briefing been carried out?

Plant

Plant

  • Have vehicle inspections sheets been completed?

  • Is 12 monthly thorough examination certificate (MEWP/HIAB) in place?

  • Is 6 monthly through examination certificate (harness/slings) in place?

Activity Checks

Activity checks - New installation

  • Is activity control supplementary check sheet available and complete?

  • Is H&S file and operations & maintenance manuals available?

  • Have new assets been recorded within relevant asset databases?

  • Have works been completed in accordance with drawings and specification?

  • Is document transmittal available?

Activity checks - maintenance activities

  • Is BS7671 schedule of test results and test certificate completed?

  • Have all materials been disposed of in accordance with specified requirements?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.