Title Page
-
Contractor
-
Tower :-
-
Flat No.:-
-
Date
-
Prepared by
-
Location
Electrical Work Checklist
RAMESHWARAM RESIDENCY, SIKAR
Quality Inspection Report Electrical Work
-
INSTRUCTIONS
1. Please answer "Yes", "No" or "N/A" on the questions below.
2. Add Photos in "Images" and Comments in "Notes" on each question.
3. Add a Corrective Measure in "Action." Provide a description, assign to a member, set priority, and due date
4. Complete the audit by providing a digital signature
5. Share your report by exporting as PDF, Word, Excel or Web Link. -
1. Door Bell Modular Box<br>Height-60"<br>Remarks: 2M
-
2. MCB<br>Height-60" <br>12 WAY SPN DB<br>LIGHT CIRCUIT-03<br>POWER CIRCUIT-04
-
3. DRAWING/DINING
-
a) SB-1<br>Height-42"<br>6M
-
b) CFL<br>Height-90"
-
c) TELEPHONE<br>Height-24"<br>1M
-
d) LP For Telephone<br>Height-24"<br>3M
-
e) Tubelight<br>Height-90"
-
f) Buzzer for Bell<br>Height-90"
-
g) TV <br>Height-48"<br>1M
-
h) LP for TV<br>Height-48"<br>3M
-
4. KITCHEN
-
a) SB-2<br>Height-42"<br>6M
-
b) P1 (FRIDGE)<br>Height-42"<br>3M
-
c) Tubelight<br>Height-90"<br>
-
d) P2 (Kitchen Appliances)<br>Height-42"<br>3M
-
e) P3 (R.O)<br>Height-78"<br>3M
-
f) Ceiling Rose (Exhaust Fan)
-
5. BEDROOM
-
a) SB-3<br>Height-42"<br>8M<br>
-
b) P3 (COOLER)<br>Height-12"<br>3M
-
c) CFL<br>Height-90"
-
d) Tubelight
-
e) TV <br>Height-48"<br>1M
-
f) LP For TV<br>Height-48"<br>3M
-
6) INDIAN TOILET
-
a) SB-4<br>Height-42"<br>6M
-
b) PP (GEYSER)<br>Height-78"<br>2M
-
c) CFL<br>Height-90"
-
d) Celing Rose (Exhaust Fan)
-
7. MASTER BEDROOM
-
a) SB-5<br>Height-42"<br>8M
-
b) P4 (COOLER)<br>Height-12"<br>3M
-
c) CFL<br>Height-90"
-
d) TV <br>Height-48"<br>1M
-
e) LP For TV<br>Height-48"<br>3M
-
f) Tubelight<br>Height-90"
-
8. WESTERN TOILET
-
a) SB-6<br>Height-42"<br>3M
-
b) CFL<br>Height-90"<br>
-
c) Celing Rose (Exhaust Fan)
-
9. BALCONY<br>a) SB-7<br>Height-42"<br>1M
-
Overall Remark(s) and Comment(s)
Signatures
-
Quality Assurance Engr. (Name & Signature)
-
Checked by (Name & Signature)