Title Page
-
Site conducted (F1/F2/F3)
-
Conducted on
-
Prepared by
-
Machine / Station
-
Operator
-
Measuring equipment (digital / gauges)
-
Is CONTROLLED paperwork present with the batch?
-
Does the paperwork contain the necessary information and has been initialled by operators in the relevant operator inspection stamps for work produced to the time of inspection?
-
Do the parts correspond in quantity to that currently produced?
-
Where appropriate the material certificate number has been recorded on the paperwork?
-
Do the parts correspond in quality to that specified on the appropriate Drawing.
-
Please sign OPERATOR 1 IN 20 or 1 IN 100 INSPECTION STAMP (inspector initials at the quantity last inspected by the operator)
-
NCR raised?
-
NCR No?
-
Documentation