Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Type of work to be quoted.

  • What is the customer wanting quoted?

Is there any sparking or insulation barrier under existing roof sheets?

  • Has existing roof got timber battens or metal top hat battens to secure roof?

Is certification on structure required?

  • Has existing dwelling got current compliant tie downs and spans ?

Type of dwelling,single, double,or multi level?

  • Is the work area accessible?

  • Is the quote going to be emailed to customer?

Roof type

  • Roof type and profile on existing roof.

Is colourbond ultra or standard required for warranty on products

  • Preferred place for delivery of materials.

  • Does the customer want any old sheets or are we removing all old material from site?

  • Roof type will be .42 unless otherwise specified by customer or span on batten’s required thicker gauge .

  • Does the customer require any variation in colours from roof to gutter or barge caps ?

  • How far from salt environment is the roof , and is it breaking surf or calm water?

Safety allowances.

  • Do we require allowance for removing solar power or any other electrical equipment on roof ?

  • Do we require any works to be completed by harness connection?

  • Do we require any crane lifts ?

  • Do we require tressel or planks to complete any works , if so how high?

  • Do we require bunting or traffic control for any process of works ?

  • Safe area to store materials new and old ?

  • Guard rail or walk around scaffolding required?

  • Is there above ground power connection to house?

Penetrations on existing building or new to be fitted .

  • How many vents and what size?

  • Is there solar hot water on existing and if so what type ?

  • Is there a tv or Austar dish and do they want refitted?

  • Are there any existing skylights or new ones to be installed?

  • Is there any whirlybirds on Existing or new to be fitted?

Aprons, barges weather boards.

  • Are there any soffits broken or cracked already ?

  • What condition are weather boards and fibro wall cladding in?

  • What type of ridge caps and do they want the same ?

  • What profile are the Existing barge caps and do they want the same?

  • Are we removing weather boards to remove existing aprons and install new?

Existing gutter , downpipes and stormwater systems.

  • What bracket system is used on gutters and are we using same ?

  • What colour is gutter and downpipes ?

  • Is fascia existing timber or metal ?

  • Has gutters got excessive leaf debris in it ?

  • Is there existing gutter guard or are we installing it ?

  • Do existing downpipes connect to stormwater or tanks ?

  • Is existing gutter and downpipes in good order ?

  • Are downpipes installed at no more than 12metres apart ?

Insulation barrier .

  • Are we removing existing barrier to complete batten replacement ?

  • Does existing have any insulation barrier under roof sheets ?

Roof battens .

  • Is there ceiling cavity or cathedral ceilings ?

  • What is type of existing battens ?

  • Are we replacing roof battens to complete works ?

Has customer understood full work scope that we are quoting on ?

  • Has customer seen roof / gutter/ downpipe profiles and given approval ?

  • Has customer seen colour samples and given approval ?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.