Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
PV Installation Inspection Checklist Form 154
-
Solargain: F154 PV Installation Inspection Check list (Pre)
Job Details
-
Street #
-
Street Name:
-
Suburb
-
State
-
Postcode
-
Customer Name
-
Sales Order Number:
Installer Details
-
If Contractor: Contractor Business Name:
-
Additional Workers Name
-
SG Office Manager
-
Electrician/Site Supervisor Name
-
Trade Assistant/s Name
-
Authorised Contractor
-
Worker Licensees & Competencies Valid
-
(MYOSH - Installation Contractor Register To Verify Contractor & Worker/s are Authorised)
Vehicle Inspection
-
Vehicle Registration Number
-
Tyres are in good condition
-
Spare Tyre is serviceable
-
Indicator Lights Functional
-
Braking Lights Functional
-
Seat belts functional
-
Seat Belts in Good condition
-
Vehicle Clean and Tidy
-
First Aid kit available
-
First Aid Kit has personal items in it? (By law, personal care items such as Aspirin, Panadol etc are not allowed to be inside the first aid kit. If they are in, please remove them immediately)
-
First Aid Kit Serviceable
-
Fire Extinguisher Available
-
Fire Extinguisher Serviceable
-
Tie downs used to secure materials
-
Materials and Goods are in good working order
-
MSDS (SDS) for all chemicals available
-
Additional MSDS (SDS) required
Site Safety
-
SWMS Presented to Inspector
-
SWMS Completed
-
SWMS Completed Accurately
-
Gutter Guard In place
-
Ladder Tied Off
-
Fall Restraint / Fall Prevention PPE available at site
-
Fall Restraint / Fall Prevention PPE in use at site
-
Equipments Testing and Tags up to date?
-
Installer in Hi-Vis SG Uniform?
-
Installer Wearing Safety Shoes?
-
Other PPE Available?
Document Review:
-
Does the installation match system design on quotation?
-
What (if any) are the variance's final system design vs initially quoted design?
-
Installation Checklist 1 Completed?
-
Install & Commission Checklist Completed?
-
Electrical Safety Certificate Completed?
Installation
-
Is P-ER-EZ-IB-SR 249/100, a Clenergy isolator bracket being used for this installation under progress?
Cabling Requirements
-
The following are approved item List 2016 02 24 KW
-
Are the cables being used among the list of approved cables in the above table? (If in doubt, please ask installation manager or Kai W.)
-
Is the Crimping tool being used the approved MC4 crimper?
Corrective Action Required
-
Corrective Actions Required?
-
Corrective Actions To Be Completed:
-
Site Inspected By:
-
Date:
-
Signature: