F156 PV Post Installation Inspection Check list
-
F156 PV Post Installation Inspection Check list
Job Details
-
Street #
-
Street Name:
-
Suburb
-
State
-
Postcode
-
Customer Name
-
Sales Order Number:
Installer Details
-
If Contractor: Contractor Business Name:
-
Additional Workers Name
-
SG Office Manager
-
Electrician/Site Supervisor Name
-
Trade Assistant/s Name
-
Authorised Contractor
-
Worker Licensees & Competencies Valid
-
(Review SharePoint - Installation Contractor Register To Verify Contractor & Worker/s are Authorised)
Installation
-
AC cabling and wiring compliant with 5033 and AS/NZS 3000:2007 <br>(including ac breakers, switchboard wiring and switchboard identification):<br>
-
DC cabling and wiring compliant with AS/NZS 5033 and AS/NZS 4777 (including all DC isolators, Dc cable in roof, module cabling and configuration, IP rated):
-
Inverter compliant with AS/NZS 5033 and inverter manual (including AC/DC box below inverter):
-
Is P-ER-EZ-IB-SR 249/100, a Clenergy isolator bracket being used for this installation under progress?
-
Does installation comply with Solargain’s standards?
-
Is the installation aesthetically pleasing?
-
PV array complies with frame manufacturers spec (including the correct amount of feet):
-
Any issues regarding the array (including shading and orientation) that has not been signed off by the customer:
-
What brand of AC isolator is being used? <br>(For the following 6 questions use F 157 PV Approved Isolators and Cables List as a reference)<br>
-
Is the crimping tool being used to SG standards?
-
AC cabling and wiring compliant with 5033 and AS/NZS 3000:2007 <br>(including ac breakers, switchboard wiring and switchboard identification):<br>
-
The following are Approved item List 2016 02 24 KW.
-
What brand of DC isolator is being used?
-
What brand of AC cable is being used?
-
What brand of DC cable is being used?
-
Is there any un-approved isolator in use?
HW Stickers - The following 2 questions on HW stickers are applicable only to WA
-
Was client asked if s/he gives permission to fit sticker?
-
Was sticker fitted? (if yes, email photo evidence to sdhw.stickers@solargain.com.au )
Corrective Action Required
-
corrective Actions Required?
-
Corrective Actions To Be Completed:
-
Site Inspected By:
-
Date:
-
Signature: