Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

F156 PV Post Installation Inspection Check list

  • F156 PV Post Installation Inspection Check list

    SG Logo.png

Job Details

  • Street #
  • Street Name:

  • Suburb

  • State

  • Postcode

  • Customer Name

  • Sales Order Number:

Installer Details

  • If Contractor: Contractor Business Name:

  • Additional Workers Name

  • SG Office Manager

  • Electrician/Site Supervisor Name

  • Trade Assistant/s Name

  • Authorised Contractor

  • Worker Licensees & Competencies Valid

  • (Review SharePoint - Installation Contractor Register To Verify Contractor & Worker/s are Authorised)

Installation

  • AC cabling and wiring compliant with 5033 and AS/NZS 3000:2007 <br>(including ac breakers, switchboard wiring and switchboard identification):<br>

  • DC cabling and wiring compliant with AS/NZS 5033 and AS/NZS 4777 (including all DC isolators, Dc cable in roof, module cabling and configuration, IP rated):

  • Inverter compliant with AS/NZS 5033 and inverter manual (including AC/DC box below inverter):

  • Is P-ER-EZ-IB-SR 249/100, a Clenergy isolator bracket being used for this installation under progress?

  • Does installation comply with Solargain’s standards?

  • Is the installation aesthetically pleasing?

  • PV array complies with frame manufacturers spec (including the correct amount of feet):

  • Any issues regarding the array (including shading and orientation) that has not been signed off by the customer:

  • What brand of AC isolator is being used? <br>(For the following 6 questions use F 157 PV Approved Isolators and Cables List as a reference)<br>

  • Is the crimping tool being used to SG standards?

  • AC cabling and wiring compliant with 5033 and AS/NZS 3000:2007 <br>(including ac breakers, switchboard wiring and switchboard identification):<br>

  • The following are Approved item List 2016 02 24 KW.

    Approved item List 2016 02 24 KW.GIF
  • What brand of DC isolator is being used?

  • What brand of AC cable is being used?

  • What brand of DC cable is being used?

  • Is there any un-approved isolator in use?

HW Stickers - The following 2 questions on HW stickers are applicable only to WA

  • Was client asked if s/he gives permission to fit sticker?

  • Was sticker fitted? (if yes, email photo evidence to sdhw.stickers@solargain.com.au )

Corrective Action Required

  • corrective Actions Required?

  • Corrective Actions To Be Completed:

  • Site Inspected By:

  • Date:

  • Signature:

Please Note: The Inspector is to sign onto the JSA/SMWS upon arrival at job site. Inspection results to be entered into Inspections register & report uploaded to site inspection folder

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.