Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
HIAB Lifter Pre-Start Check-list
Site Details
-
Select location:
- ACT-Fyshwick
- Vic-Port Melbourne
- QLD-Deception Bay
- NSW-Sydney
- WA-Rockingham
- WA-Hilton
- WA-Midvale
- WA-Malaga
- If not in the list, please enter below...
-
If location is not in the above list, please enter here:
-
Week Starting:
-
Vehicle Registration Number:
Check-list Questions:
-
It is the responsibility of the operator/driver of plant equipment to ensure that this check-list is completed prior to the plant being operated. Before using the machine, please ensure that you have, in your person, your current licenses/competency to operate this machine.
-
After you complete this inspection, please email it to your Solargain manager so that it's uploaded to the relevant vehicle/truck inspection in MYOSH register. If you are a subcontractor, please ensure that you have contacted Solargain installations, operations or WHS for permission to use the machine.
-
Start Day of the week: (Usually the first Monday):
Inspection for the week starting on the above date:
-
Inspection Day:
-
Lights, Warning Devices, Signs, Gauges etc
-
Check Hydraulics - leaks, damage, connections
-
Components - damaged, broken
-
Wheels - tyres, loose nuts, wear, suspension.
-
Pins - pivots, rams, lift arms, bucket pins
-
Quick-hitch independent connector secured.
-
Guards - in place, secure, warnings.
-
Conditions of - hooks, Sheaves, chains, tracks, slings.
-
Cabin - control loose objects, seat belts, windscreens, visibility, rear view mirrors, seat function.
-
Operation of brakes, steering controls, wipers, levers, buckets, before moving off.
-
Other e.g. Fire Exit. Electrical connections, wiring etc
-
IMPORTANT: Have you checked around the plant before moving
-
Detail of any other defects or damage....
-
Inspection Conducted By:
-
PRINT NAME
-
Date
-
Signature
Faults Reported:
-
Detail of any other defects or damage....
-
NOTE: Operator to TAG OUT machine as "Out of Service" if needed.
-
PRINT NAME
-
Date
-
Signature
-
ACTION TAKEN TO RETURN TO SERVICE
-
Please explain what action/s were taken to return it to service:
-
PRINT NAME
-
Signature