Title Page
-
Disclaimers:
The Specifications below, are to be used as a guide to complete a repair, to provide consistency with the quote procedure.
The Contractor to check with local authority and establish if the building is listed. The contractor should note that where the works are to be carried out to a listed building, they should allow for all necessary fees and costs applicable for liaising with the Local Authority and all relevant statutory bodies and for gaining approval for the works prior to starting on site.
Asbestos register to be checked and advise Building Surveyor if areas of works are not covered by the register.
All relevant Permits, Planning Applications, Building Regulations Approval and Parking Dispensations are the responsibility of the Contractor:
All rubbish and redundant materials are to be removed from site on completion of the works and disposed of.
Only works detailed in this Report are to be included within your Quote/Estimate
**Any works/recommendations over and above as detailed within this document, should be submitted on a separate Quote/Estimate in the first instance**
Assume all Measurements to be approximate - All measurements should be confirmed by Contractor prior to submitting Quote /Estimate. -
Site Name
-
Location
-
Date
-
Prepared by
-
Return Date of Quote / Estimate
Scope of Works
- Defect
-
Location on SIte
-
Description of Defect and Proposed Repair
-
Quantity / Area
-
Photo of Defect