Information

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

1. Chapter 8 Compliance

  • Signage set up in correct sequence

  • All relevant road signs & barriers in place

  • All required tapping rails in place

  • Safety zone in place & and correctly set up

  • Temp walkway (code of practice) - kerb ramp if required

  • All tools, equipment and spoil within barriers

  • Traffic lights set up correctly if required

  • Stop/Go boards available if required

2. Health and Safety

  • Ganger NRSWA Certified

  • Get maps/Sections/Legends (HSG 47)

  • Risk assessment - before works started

  • Health and safety plan (team safety pack) inc COSHH

  • Locating & mark up procedures observed

  • All electrical tools inspected and in date

  • Jackhammer sound proofed

  • Class 2 or 3 Hi-Vis worn by all on site

  • Flame retardant clothing worn by all

  • Safety footwear worn by all on site

  • Hard hats worn by all on site

  • Ear protection available and used if required

  • Googles and dust masks available and worn if required

  • Suitable gloves available and worn if required

  • First aid box available and to standard

  • Disc cutter blade removed and boxed

  • Wacker upright and supported in van

  • CAT and Genny in date calibration

  • All mobile plant and lifting equipment inspected and tagged

3. Water Quality

  • Measures take to avoid contamination

  • Chloros available and in date

  • Water Hygiene Card carried by all

  • Pipe ends capped & fittings kept clean & protected

  • Sump hole in excavation if required

4. Quality of work

  • Correct pipe depth 750-1000mm

  • Suitable pipe protection (sand or shingle)

  • Suitable back fill material used (type 1)

  • Back fill materials segregated

  • Excavation back filled in layers

  • Reinstatement to required standard (HAUC)

  • All apparatus, fixings & fittings to Thames Water spec

  • Any chapter 8, spoil or equipment left on site

  • Work being completed as instructed

5. Public Image

  • Site clean and tidy within barriers

  • Chapter 8 equipment clean and free from defects

  • Chapter 8 correctly branded

  • No items obstructing pedestrian footpath

  • Thames Water courtesy boards in good order

  • Vehicle livery in good order

  • Van clean and presentable inside and out

  • Company uniform worn by all

  • Valid number plate and working tailboard

  • Crew polite and helpful to public.

6. Site Documentation & Equipment

  • Company identification carried by all

  • Site visitors register up to date

  • PDA available

  • Leak detection record available

  • Vistec, Gismo, DCF used and completed

7. Environmental Audit

  • Spill kit available

  • Compressor HUD closed and muffs fitted.

  • Plant and equipment free from oil or fuel leaks.

  • Dust suppression methods used.

  • Waste water free from contaminants.

  • Rhino bags available and used if required.

  • Eyewash in date and available.

  • Daily PUWER inspections completed.

Corrective Actions

  • Enter any corrective actions that will be undertaken

Sign Off

  • On site representative

  • Auditor's signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.