Information
-
Audit No.
-
RAMC North Coast Region - Slashing Rural
-
Audit Title
-
Contractor
-
Road
- 10A Bruce Hwy
- 18A Warrego Hwy
- 40A D'Aguilar Hwy
- 40B D'Aguilar Hwy
- 42A Brisbane Valley Hwy
- 120 Redcliffe Rd
- 121 Deception Bay Rd
- 122 Brighton-Redcliffe Rd
- 123 Clontarf-Anzac Av Rd
- 127 Beerburrum Rd
- 126 Caboolture-Bribie Island Rd
- 127 Beerburrum Rd
- 128 Caboolture-Beachmere Rd
- 130 Nambour-Bli Bli Rd
- 132 Caloundra Rd
- 133 Maroochydore-Noosa Rd
- 134 Mooloolaba
- 135 Maroochydore-Mooloolaba Rd
- 136 Maroochydore Rd
- 138 Yandina-Coolum Rd
- 140 Eumundi-Noosa Rd
- 141 Kin Kin Rd
- 142 Cooroy-Noosa Rd
- 144 Emu Mountain Rd
- 145 Cooroy Connection Rd
- 150A Sunshine Mwy
- 150B Sunshine Mwy
- 151 Caloundra-Mooloolaba Rd
- 152 Kawana Way
- 153 Nicklin Way
- 401 Brisbane-Woodford Rd
- 402 Samford-Mt Glorious Rd
- 403 South Pine Rd
- 405 Esk-Kilcoy Rd
- 406 Burpengary-Caboolture Rd
- 407 Samford Rd
- 410 Wivenhoe-Somersat Rd
- 411 Coominya Connection Rd
- 412 Foresthill-Fernvale Rd
- 414 Esk-Hampton Rd
- 481 Kenilworth-Brooloo Rd
- 484 Eumundi-Kenilworths Rd
- 485 Kenilworth-Skyring Ck Rd
- 489 Nambour Connection Rd
- 490 Glasshouse Mtns Rd
- 491 Kilcoy-Murgon Rd
- 492 Kilcoy-Beerwah Rd
- 493 Maleny-Stanley River Rd
- 494 Landsborough-Maleny Rd
- 495 Maleny-Kenilworth Rd
- 496 Nambour-Mapleton Rd
- 497 Maleny-Montville Rd
- 498 Woombye-Montville Rd
- 499 Montville-Mapleton Rd
- 900 Everton Park-Albany Ck Rd
- 901 Burpengary Service Rd
- 902 Linkfield Connection Rd
- 914 Cooroy-Gympie Rd
- 915 Pacific Paradise Connection Rd
- 1204 Pumicestone Rd
- 1305 Yandina-Bli Bli Rd
- 1403 Pomona Connection Rd
- 1412 Boreen Rd
- 1421 Boreen Point-Tewantin Rd
- 4023 Mt Glorious Rd
- 4032 Strathpine-Samford Rd
- 4144 Gatton-Esk Rd
- 4906 Mooloolah Connection Rd
- 4962 Obi Obi Rd
- 4981 Palmwoods-Mooloolah Rd
- 9901 Yandina Sth Connection Rd
- 9902 Yandina Nth Connection Rd
- 9905 Caboolture Connection Rd
-
Start & End Chainage
-
Conducted on
-
Prepared by
-
Traffic management appears suitable for task being undertaken.
-
Conduct Traffic Management Audit.
-
DM Rep onsite for site marking out?
-
Works procedure onsite and being followed
-
Quantities measured and recorded. Record quantities on Dissection sheet – Checked by supervisor
Activity 401 Specifications.
-
Slashed Areas (Rural) Includes Hand Mowing. Areas mowed are: • 3.6m (2 machine passes) on each sides of carriageway • Visibility triangles • Greater distance on inside of curves 9m for tight curves and 14m for high speed curves • 120m in front of signs • 2m perimeter around noise barriers • Areas as required by principal
-
All medians, raised islands and drains mowed to meet the agreed intervention levels.
-
Mowing has been undertaken where a greater width should be mowed to destroy any tree seedlings growing within the clear zone and/or in table drains. In 100kmh speed zones, the width to be slashed in this way is 9.0m from the edge of the traffic lane. <br>Check to see when last wide mow was completed. If recently then area is conforming.
-
The slashed vegetation shall be less than 100 mm high for the areas stated above
-
No debris is to be thrown onto the sealed carriageway
-
There is a clear view of all signs, guide markers and guardrails
-
Additional Comments and Observations
Audit Sign-off
-
Inspector
-
Date of Audit completed