Information
-
Audit No.
-
RAMC North Coast Region - Traffic Signage Audit
-
Audit Title
-
Contractor
-
Road
- 10A Bruce Hwy
- 18A Warrego Hwy
- 40A D'Aguilar Hwy
- 40B D'Aguilar Hwy
- 42A Brisbane Valley Hwy
- 120 Redcliffe Rd
- 121 Deception Bay Rd
- 122 Brighton-Redcliffe Rd
- 123 Clontarf-Anzac Av Rd
- 127 Beerburrum Rd
- 126 Caboolture-Bribie Island Rd
- 127 Beerburrum Rd
- 128 Caboolture-Beachmere Rd
- 130 Nambour-Bli Bli Rd
- 132 Caloundra Rd
- 133 Maroochydore-Noosa Rd
- 134 Mooloolaba
- 135 Maroochydore-Mooloolaba Rd
- 136 Maroochydore Rd
- 138 Yandina-Coolum Rd
- 140 Eumundi-Noosa Rd
- 141 Kin Kin Rd
- 142 Cooroy-Noosa Rd
- 144 Emu Mountain Rd
- 145 Cooroy Connection Rd
- 150A Sunshine Mwy
- 150B Sunshine Mwy
- 151 Caloundra-Mooloolaba Rd
- 152 Kawana Way
- 153 Nicklin Way
- 401 Brisbane-Woodford Rd
- 402 Samford-Mt Glorious Rd
- 403 South Pine Rd
- 405 Esk-Kilcoy Rd
- 406 Burpengary-Caboolture Rd
- 407 Samford Rd
- 410 Wivenhoe-Somersat Rd
- 411 Coominya Connection Rd
- 412 Foresthill-Fernvale Rd
- 414 Esk-Hampton Rd
- 481 Kenilworth-Brooloo Rd
- 484 Eumundi-Kenilworths Rd
- 485 Kenilworth-Skyring Ck Rd
- 489 Nambour Connection Rd
- 490 Glasshouse Mtns Rd
- 491 Kilcoy-Murgon Rd
- 492 Kilcoy-Beerwah Rd
- 493 Maleny-Stanley River Rd
- 494 Landsborough-Maleny Rd
- 495 Maleny-Kenilworth Rd
- 496 Nambour-Mapleton Rd
- 497 Maleny-Montville Rd
- 498 Woombye-Montville Rd
- 499 Montville-Mapleton Rd
- 900 Everton Park-Albany Ck Rd
- 901 Burpengary Service Rd
- 902 Linkfield Connection Rd
- 914 Cooroy-Gympie Rd
- 915 Pacific Paradise Connection Rd
- 1204 Pumicestone Rd
- 1305 Yandina-Bli Bli Rd
- 1403 Pomona Connection Rd
- 1412 Boreen Rd
- 1421 Boreen Point-Tewantin Rd
- 4023 Mt Glorious Rd
- 4032 Strathpine-Samford Rd
- 4144 Gatton-Esk Rd
- 4906 Mooloolah Connection Rd
- 4962 Obi Obi Rd
- 4981 Palmwoods-Mooloolah Rd
- 9901 Yandina Sth Connection Rd
- 9902 Yandina Nth Connection Rd
- 9905 Caboolture Connection Rd
-
Start & End Chainage
-
Conducted on
-
Prepared by
Traffic General
-
MUTCD Diagram Number
- 1A Short term - frequently changing: clear of traffic lanes - workers on foot
- 1B Short term - frequently changing: clear of traffic lanes - plant only
- 2 Short-term - full lane closure: residential street - low speed - 50 km/h maximum speed limit
- 3 Short term - part lane closure: two-way road - low speed
- 4 Short-term - full lane closure: two-way road
- 5 Short-term - traffic through work area: two-way road
- 6 Short-term - lane closure: work in centre lane - multilane undivided road
- 7A Short-term - left lane closure: multilane divided road
- 7B Short-term - left lane closure: multilane undivided road
- 7C Short-term - median lane closure: multilane divided road
- 7D Short-term - median lane closure: multilane divided road
- 8 Short-term - occupation of centre of roadway: two-way road
- 9 Short-term - temporary closure of roadway: multilane divided road
- 10 Shoulder closure - two-way road
- 11 Short-term - part lane closure: two-way road
- 12 Lane closure: two-way road or bridge
- 13 Long-term lane closure: two-way road
- 14 Long-term lane closure: multilane divided road
- 15 Long-term lane closure of 2 outer lanes: multilane undivided road
- 16 Long-term - closure of 2 central lanes: multilane undivided road
- 17 Short-term - closure of one side: multilane undivided road - low speed
- 18 Short-term - closure of one side: multilane undivided road - high speed
- 19 Lane closure: major roundabout
- 20 Part lane closure: minor roundabout
- 28 One direction detour: two-way road
- 29 Detour all traffic: two-way road
- 30 Exit closure: multilane, one-way roadway
- 31 Road temporarily closed: two-way road
- 32 Linemarking: all roads
- 33 Kerbside work: intersection of a two minor roads
- 34 Kerbside work: intersection of a minor and a major road
- 35 Kerbside work: intersection of two major roads
- 36 Work occupying the full width of a footpath
- 37 Closure of two outer lanes: one direction - multilane road
-
Contractor's TGS onsite?<br>(include photo if available)
-
Traffic Signage Records being completed onsite?<br>(include photo of records sheet if available)
-
Level 2 Traffic Controller onsite?<br>(include photo of accreditation if available)
-
All signage and traffic management in accordance with MUTCD and other relevent specifications (including removal/non-removal of signs when works are completed).
-
Speed zones and/or flagmen signs only active when work is being performed or are required for user safety.
-
Limits of speed zones and/or flagmen signs applicable to the limit of the physical work on the Site
-
Minimal impact on traffic flow
-
Other site details (Works being completed, Traffic Controller, Personnel onsite, etc)
Signage
-
Traffic Direction 1
-
Select Signs used onsite
(Included photo and chainage) -
Roadworks Ahead 1km
-
Roadworks Ahead / 80km / Reduce Speed
-
Roadworks Ahead / 60km / Reduce Speed
-
Roadworks Ahead
-
Workmen Ahead / 60km / Reduce Speed
-
Workmen Ahead / 60km Ahead / Reduce Speed
-
Workmen Ahead / 40km Ahead / Reduce Speed
-
Workmen Ahead
-
Traffic Controller / Prepare to Stop / Do Not Overtake
-
Traffic Controller / 60km / Prepare to Stop
-
Traffic Controller / 40km Ahead / Prepare to Stop
-
Speed Sign 40km, 60km, 80km<br>(indicate which sign)
-
End Roadworks / Speed / Drive Safety
-
Lane Closure<br>(indicate number of lanes)
-
Mowing Ahead
-
Other Signs / Devices utilised<br>(include details of signs)
-
Traffic Direction 2
-
Select Signs used onsite
(Included photo and chainage) -
Roadworks Ahead 1km
-
Roadworks Ahead / 80km / Reduce Speed
-
Roadworks Ahead / 60km / Reduce Speed
-
Roadworks Ahead
-
Workmen Ahead / 60km / Reduce Speed
-
Workmen Ahead / 60km Ahead / Reduce Speed
-
Workmen Ahead / 40km Ahead / Reduce Speed
-
Workmen Ahead
-
Traffic Controller / Prepare to Stop / Do Not Overtake
-
Traffic Controller / 60km / Prepare to Stop
-
Traffic Controller / 40km Ahead / Prepare to Stop
-
Speed Sign 40km, 60km, 80km<br>(indicate which sign)
-
End Roadworks / Speed / Drive Safety
-
Lane Closure<br>(indicate number of lanes)
-
Mowing Ahead
-
Other Signs / Devices utilised<br>(include details of signs)
-
Traffic Direction 3
-
Select Signs used onsite
(Included photo and chainage) -
Roadworks Ahead 1km
-
Roadworks Ahead / 60km / Reduce Speed
-
Roadworks Ahead
-
Workmen Ahead / 60km / Reduce Speed
-
Workmen Ahead / 60km Ahead / Reduce Speed
-
Workmen Ahead / 40km Ahead / Reduce Speed
-
Workmen Ahead
-
Traffic Controller / Prepare to Stop / Do Not Overtake
-
Traffic Controller / 60km / Prepare to Stop
-
Traffic Controller / 40km Ahead / Prepare to Stop
-
Speed Sign 40km, 60km, 80km<br>(indicate which sign)
-
End Roadworks / Speed / Drive Safety
-
Lane Closure<br>(indicate number of lanes)
-
Mowing Ahead
-
Other Signs / Devices utilised<br>(include details of signs)
-
Traffic Direction 4
-
Select Signs used onsite
(Included photo and chainage) -
Roadworks Ahead 1km
-
Roadworks Ahead / 80km / Reduce Speed
-
Roadworks Ahead / 80km / Reduce Speed
-
Roadworks Ahead / 60km / Reduce Speed
-
Roadworks Ahead
-
Workmen Ahead / 60km / Reduce Speed
-
Workmen Ahead / 60km Ahead / Reduce Speed
-
Workmen Ahead / 40km Ahead / Reduce Speed
-
Workmen Ahead
-
Traffic Controller / Prepare to Stop / Do Not Overtake
-
Traffic Controller / 60km / Prepare to Stop
-
Traffic Controller / 40km Ahead / Prepare to Stop
-
Speed Sign 40km, 60km, 80km<br>(indicate which sign)
-
End Roadworks / Speed / Drive Safety
-
Lane Closure<br>(indicate number of lanes)
-
Mowing Ahead
-
Other Signs / Devices utilised<br>(include details of signs)
-
Overall Comments regarding Contractor's Traffic Set-up?
Audit Sign-off
-
Inspector
-
Date of Audit completed