GENERAL
TRAINING & PLANNING
-
Copy of current OSHA standards, Rawlins Safety manual on site
-
Have all new hires completed the new hire orientation?
-
Weekly tool box meeting held for Rawlins?
-
Copy of B&G job specific Safety plan on site and up to date?
-
Emergency evacuation plan in place?
-
Foreman's PTP Pre-Task Planning) completed and adequate for tasks being performed?
MEDICAL & FIRST AID
-
At least one Rawlins employee trained in first aid/CPR on site?
-
Are first aid supplies adequate?
POSTING & RECORDKEEPING
-
OSHA 300 form being completed/posted?
-
Safety and health poster posted?
-
Emergency telephone numbers posted?
-
Medical clinic posted?
HAZARD COMMUNICATION/MSDS
-
Copy of Rawlins Hazard written program onsite?
-
List of hazard materials on site (Rawlins)?
-
MSDS current for all contractors on site
-
Labels on containers
TRAFFIC CONTROL
-
Advance warning signs
-
Trained flaggers used when directing traffic w/proper PPE, proper stop/slow sign and flagger ahead signs warning approaching traffic.
PUBLIC PROTECTION
-
Public protection adequate including warning signs?
HOUSEKEEPING
-
Housekeeping: aisles clean, scrap removed, no protruding nails?
-
Adequate supply of water or water jugs, cups and trash containers?
PERSONAL PROTECTIVE & LIFE SAVING EQUIPMENT
-
-
-
Head,eye, face, and hand protection worn?
-
Respiratory protection worn when needed/required?
-
Safety harnesses, lifelines and lanyard worn when needed/required?
FIRE PROTECTION & PREVENTION
-
Flammable & combustible liquids in approved containers only?
-
Have all fire extinguisher been inspected for (use, charged, pin in place, ABC label & damaged)?
-
Have employees been trained on P.A.S.S?
-
Are all fire extinguishers onsite that have been discharged offsite?
ELECTRICAL
-
Guarding of live parts by enclosures?
-
GFCI receptacle used including when using power?
-
Temporary lighting adequate and bulbs protected?
-
Lockout/Tagout being used?
-
Extension cords hung minimum 8ft above floor?
-
Do any extension cords have any cuts or nicks?
-
Do extension cords have ground pins & light factory ends?
TOOLS
-
Proper tool being used for job?
-
All tools inspected at least daily?
-
Damaged tools repaired or replaced promptly?
-
Are tools being used properly?
-
Guards in place?
-
Pneumatic tools/air hoses have proper safeguards, secured connections?<br>
-
Powder Actuated Tools:<br>Operators trained/spot check cards?<br>Tools and charges protected from unauthorized use?
LADDERS
-
Ladders properly secured to prevent slipping, sliding or falling?
-
Do straight ladders extend 36" above top of landing?
-
Offset protection at top ladder entrance?
-
Stepladders fully open when in use; no standing on top two steps?
-
Metal ladders not used around electrical hazards?
-
Proper maintenance and storage of ladders?
SCAFFOLDING
-
Is scaffold equipment in good working order?
-
Inspected by competent person daily before use?
-
Erected on solid, level footing?
-
Guardrails on open sided and end more than 6 ft above the ground?
-
2x4 top rail, mid-rail & toe board?
-
Tightly planked platform for full width and secured in place?
-
Is the scaffold plump and square, with cross-bracing?
-
Access ladder provided?
-
Maximum height = four (4) times minimum base diminsion?
-
Suspended scaffold
-
Hooks, clamps, outriggers properly anchored and tiebacks installed?
-
Counterweights attached to outriggers with weights marked?
-
Tiebacks have rigging thimble with loop, secured with min. 3 fist grip clamps?
-
Independent lifeline for each worker on platform, rope protected abrasion?
-
Safety dept. notified if welding is to take place on suspended scaffold?
FALL PROTECTION
-
Floor opening covered/guardrails in place?
-
Open-sided floors/wall opening have guardrails & toe boards?
-
Leading edge protection & signage utilized where required?
-
100% fall tie off for all heights above 6 ft with proper anchor points?
-
All horizontal lifeline systems engineered?
AERIAL MANLIFTS/SCISSORS LIFTS
-
All personnel tied off?
-
Safety chains in place on scissors lifts?
-
Employee training verified?
HEAVY EQUIPMENT
-
Regular inspection and maintenance logs complete?
-
Lights, brakes, horn, back up alarm operative?
-
Haul roads well maintained and laid out properly?
-
Seat belts being used?
-
Fire extinguisher installed?
HANDLING & STORAGE OF MATERIALS
-
Materials properly stored or stacked?
-
Stacks on firm footings not too high?
-
Are loads lifted correctly? Proper number of men or equipment used?
-
Material secured if high winds approaching?
-
Use trash chute for debris drop over 20 feet?
-
Adequate scraping arounds stored stacked material?
EXCAVATION AND SHORING
-
Comp. person(s) designated?
-
Underground utilities located/private service used if neccessary?
-
Are adjacent structures including roads/sidewalks properly shored/supported?
-
Is excavation properly sloped, shored or trench box used?
-
Tabulated data for trench box on site?
-
Means if egress within 25 feet?
-
Spoils back min. Of 2 feet?
-
Material i.e... Pipe, not stored at trench edge?
-
Is equipment a safe distance from edge of excavation?
-
Fall protection/barricading adequate?
-
Daily documented inspections or if condition change?
WELDING AND CUTTING/OTHER HOT WORK
-
Screens and shields used where necessary?
-
Goggles, gloves, proper clothing worn?
-
Electrical equipment grounded?
-
Welding leads and gases hoses protected and in good condition?
-
Fire extinguishers or proper type nearby?
-
Inspection of fire hazards?
-
Gas cylinders secured and upright. Fuel cylinders at least 20 ft from oxygen?
-
Are cylinder caps in use?
-
Fire watch used where needed/required?
CONCRETE Saw Cutting or Coring
-
Is water being used during all saw cuts & coring?
-
Controls in place to limit silica exposure - water, vacuum tools, etc...
CONFINED SPACES
-
Have potential confined space been identified?
-
Had safety Dep. been notified of potential confined spaces?
-
Permit required? Completed?
-
Atmosphere tested?
-
Workers properly trained?
-
Ventilation needed?
-
Retrieval devices required?
COMMENTS & ADDITIONAL ITEMS
-
Item #1
-
Attachment #1
-
Item #2
-
Attachment #1
-
Item #3
-
Attachment #1
-
Item #4
-
Attachment #1
-
Item #5
-
Attachment #1
-
Item #6
-
Attachment #1
-
Item #7
-
Attachment #1
-
Item #8
-
Attachment #1
-
Item #9
-
Attachment #1
-
Item #10
-
Attachment #1
-
Item #11
-
Attachment #1
-
Item #12
-
Attachment #1
-
Item #13
-
Attachment #1
-
Item #14
-
Attachment #1
-
Item #15
-
Attachment #1
-
Signatures
-
PROJECT MANGER
-
SUPERINTENDENT