Information

  • SCAFFOLDING INSPECTION

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Personnel

  • Add signature

  • Location

  • JOB NUMBER

  • Inspection Number

B) Guidance Notes

  • The person carrying out an inspection shall complete the report before the end of the work period within which the inspection is completed.

  • The results of any inspection must be notified to the person operating the work (I.e, site manager) within 24 hours of completing the inspection.

  • A Scaffold is to be inspected - a) after assembly and before first use. b) at regular intervals not exceeding seven days. c) after any event likely to affect the stability of the scaffold. d) after any adverse weather.

  • During an inspection of the scaffold every tube, board, coupling, including every member and every joint in the whole structure must be inspected separately.

C) Sketch

  • You can add photos of the elevations here.

  • Add media

1. Foundations

  • 1.1 Are the foundations firm and level?

  • Add drawing

  • 1.2 Does each standard have a timber or composite sole plate?

  • 1.3 Are timber sole plates of the correct dimensions and in good condition? (450mm long on firm ground or 765mm on soft ground. TG20:08)

  • 1.4 Do all standards have a steel base plate or base jack 150 x 150 x 5mm minimum thickness in accordance with BS EN 74-32007?

  • 1.5 Are foundations protected from any groundworks?

  • 1.6 Is the base of the scaffold protected from site plant and traffic?

  • Add media

2. Geometry

  • Add media

  • 2.1 Are standards vertical? TG:20:13 compliance sheet

  • 2.2 Are ledgers horizontal?

  • 2.3 Are the transoms horizontal?

  • 2.4 Are joints in the standards staggered and not in the same bay?

  • 2.5 Are the joins in the ledgers staggered and not in the same bay?

  • 2.6 Are the joints in the ledgers no more that one third into the bay?

  • 2.7 Are the transoms correctly spaced?

  • Add media

3. Working Platforms

  • Add media

  • 3.0 Has rope and Wheel been left on site

  • 3.1 Is the overhang a minimum of 50mm or maximum 150mm for 38mm boards?

  • 3.2 Are splits in boards less than 300mm? TG7:07

  • 3.3 Are the boards to BS 2482:2009, sound and in good condition?

  • 3.7 If boards are lapped over others, are they safe from tripping hazards?

  • 3.8 Are the boards secure?

  • 3.9 Have boards of less than 2.13m been secured?

  • 3.10 Are all boards banded at both ends?

  • 3.11 Are toe board secure with a minimum of 2 clamps?

  • 3.12 Have toe boards a side resistance of 15 kg's in accordance with TG:20?

  • 3.13 Are gaps in platforms 25mm or less (50mm where standards force through)?

  • 3.14 Are puncheons supported correctly from the ledgers or beams?

  • 3.15 Are deadmen installed correctly, on two load bearing fittings?

  • Add media

4. Bracing

  • Add media

  • 4.1 Is the ledger bracing fitted with load bearing couplers on alternative pairs of standards for the full height of the scaffold?

  • 4.3 Is the longitudinal or facade brace fitted along the face of the scaffold at a maximum of six bays?

  • 4.4 Are the ends of the longitudinal bracing fixed with double or swivel couplings to within 300mm of the node point?

  • 4.5 Has plan bracing been installed in accordance with the design?

  • Add media

5. Tubes and Fittings

  • Add media

  • 5.1 Are all the scaffold tubes to BS EN 39 and in good condition?

  • 5.2 Are all of the fitting in good condition?

  • 5.3 Have the correct fittings been used in the right location?

  • 5.4 Have the correct joint pins or sleeve couplers been used?

  • 5.5 Are the fitting to BS EN 74 and are they at the correct torque?

  • 5.6 Are supplementary couplers fitted where required?

  • 5.7 Are check couplers fitted where required?

  • 5.8 Has the "rule of thumb" been applied with tubes through couplers by at lease 25mm?

  • 5.9 Have rakers been installed correctly?

  • Add media

6. Access and Egress

  • Add media

  • 6.1 Is access provided to the full height of the scaffold? Ladders or Layher Stair case.

  • 6.2 Are the ladders angles 75 degrees max?

  • 6.3 Is the top of ladders tied securely at both stiles?

  • 6.4 Are ladders on a firm and stable base?

  • 6.5 Do ladders project at least 1.05m above each platform

  • 6.6 Where ladders don't extend above the platform are suitable and sufficient hand hold points provided?

  • 6.7 Are ladder openings minimum 450 x 600 long? Or small as practicable

  • 6.8 If ladders are inside the scaffold, are trap doors installed? (WAHR Reg 6(4)(a)b. )

  • Add media

  • 6.9 Are ladders in good overall condition?

  • 6.10 Are any rubber feet on the ladders in good condition?

  • 6.11 Are self closing ladder access gates fitted? (WAHR Reg 8(a) Part 5)

  • Add media

7. Loading

  • Add media

  • 7.1 Is the scaffolding correct for its' intended use?

  • 7.2 Are the loads on the scaffold evenly distributed?

  • 7.3 Are materials securely stacked?

  • 7.4 Are the standards spaced correctly for the loadings?

  • 7.5 Are loading bay safety gates installed?

  • 7.6 Are safety gates installed in accordance with manufactures instructions?

  • Add media

8. Ties

  • Add media

  • 8.1 Have sufficient ties been used in accordance with TG20:13, Every other lift and every other pair of standards) every 4m?

  • 8.2 Have the ties been fixed with right angled load bearing couplers?

  • 8.3 Have drilled anchors been tested in line with TG4:11 and pull test certificates provided.

  • 8.4 Have tested ties been tagged?

  • 8.5 Have the ties been fixed to both inner and outer standards or ledgers?

  • Add media

9. Guard Rails and Toe Boards

  • 9.1 Are all the guard rails and intermediate guard rails fixed to the inside of the standards with double couplings?

  • 9.2 Are guard rails a minimum 950mm above working platforms?

  • 9.3 Is the gap between guard rails 470mm or less?

  • 9.4 Has Sheeting or Netting,Been Fixed To The Scaffolding

  • 9.5 Where required, are brick guards fitted?<br>

  • 9.6 Have the toe boards been secured to the inside of the standards?

  • 9.7 Are the toe boards connected with two fittings?

  • Add media

10. Work area around the scaffold

  • Add media

  • 10.1 Is the work are tidy?

  • Add media

  • 10.3 Are working areas free of trip hazards?

  • Add media

11. Documentation

  • 10.2 Are all materials stored in their proper locations?

  • Add media

  • 11.1 Is there a first use inspection and hand over certificate in place?

  • 11.2 Is max load capacity of this type of scaffold communicated to all employees?

  • 11.3 Where required have all necessary permits been obtained?

  • 11.4 Is there a "Tagging" system in place?

  • Add media

12. Sign off

  • Note - an employer receiving a report or copy report under the Work at Height Regulations must keep the copy at the site where the inspection was carried out until the construction work is complete and ; thereafter an office of his for at lease three months.

  • 12.1 Comments about the site etc

  • Add media

  • 12.2 Name of person completing this report.

  • Add signature

  • Date and time inspection completed.

  • 12.3 Name of the site person receiving this report.

13. Closure

  • Name of the person closing this report.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.