Page 1: Project Info
-
Item no.
-
Road name
-
Town / suburb
-
Start CH (m)
-
End CH (m)
-
Length (m)
-
Road width (m)
-
Area (m2)
-
Inspection carried out by
-
Inspection date
-
Prestart Inspection no.
Page 2: Site Inspections
-
Are chainages pegged
-
Check area (is it the same as the project schedule)
-
Difference (plus or minus)
-
Quarry options
-
Is slashing required prior to works commencement
-
Do trees need clearing prior to works commencement
-
Does any U/G or O/H services conflict with works (Photos)
-
What trucks can be used on site
-
Turnaround point
-
Will any road signs need replacing (Photos) - Contact TRC
-
Where can spoil be dumped
-
Where can water be sourced
-
Has a dash cam video been recorded of site condition
-
Are there any culverts (Photos)
-
Are there any other issues
-
Details