Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Photo of site
-
Personnel
Pre-job assessment
-
Inspect site for possible hazards
-
Contact customer (if applicable(
-
Confirm safe access to meter box
-
Perform hazard assessment of meter board
-
Confirm meter number matches job sheet / palm pilot
Job completion
-
Read and record meter reading(s)
-
Ensure site is isolated at main switch
-
Put on low voltage glove(s), outer protective glove(s) & safety glasses
-
Test with volt finger to confirm site is isolated at meter & main switch
-
Remove double seal from meter cover
-
Remove meter cover
-
Remove cap and tape from tail
-
Ensure strands of wire are not frayed / loose
-
Reinsert tail into meter and tighten screws
-
Replace and re-seal meter cover (single seal only)
Post-job and vacate site
-
Tidy area including removing old seals from bottom of meter box
-
Complete "reconnection notice" and give to customer, or place in letter box, under front door, or in meter box
-
Vacate site
-
Tech being audited
-
Auditor