Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Photo of site

  • Personnel

Pre-job assessment

  • Inspect site for possible hazards

  • Contact customer (if applicable(

  • Confirm safe access to meter box

  • Perform hazard assessment of meter board

  • Confirm meter number matches job sheet / palm pilot

Job completion

  • Read and record meter reading(s)

  • Ensure site is isolated at main switch

  • Put on low voltage glove(s), outer protective glove(s) & safety glasses

  • Test with volt finger to confirm site is isolated at meter & main switch

  • Remove double seal from meter cover

  • Remove meter cover

  • Remove cap and tape from tail

  • Ensure strands of wire are not frayed / loose

  • Reinsert tail into meter and tighten screws

  • Replace and re-seal meter cover (single seal only)

Post-job and vacate site

  • Tidy area including removing old seals from bottom of meter box

  • Complete "reconnection notice" and give to customer, or place in letter box, under front door, or in meter box

  • Vacate site

  • Tech being audited

  • Auditor

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.