Site Information
-
Job Number
-
Tower Site ID
-
Longitude
-
Latitude
-
Date
-
Site Address
-
Supervisor / Competent Person
-
Work Being Performed (Check All That Apply)
-
Line and Antennas
-
Tower Erection
-
Civil
-
Electrical
-
Maintenance
-
Other
-
What Type of Work Being Performed?
-
Describe Elevation/Site Terrain/Environmental Concerns of Hazards
Project Personnel
-
Name (List All Employees Onsite)
-
Name of Competent Climber/Rescue
-
Name of Individual CPR/First Aid Certified
Emergency Procedures
-
Are 911 systems functional with cell phone use?
-
Rescue Procedures to Be Used
-
Internal Crew (crew has to be properly trained in tower rescue)
-
Other
-
What other sources are being used for rescue?
-
Site Specific Rescue Plan
-
Evacuation Point (Location)
-
Communication Point
-
Closest Medical Clinics
-
Local ER/Hospital (Name)
-
Local Occupational Clinic (Name, If Applicable)
Jobsite Exposures
Physical Hazards (Check All That Apply)
-
Falls From Elevations
-
Slips, Trips, or Falls
-
Vehicle Traffic
-
Electrical Cut-Overs
-
Electrical
-
Underground Utilities
-
Elevation/Site Terrain
-
Intrusive Activity
-
Drilling
-
Soil Excavation
-
Material Handling
-
Heavy Equipment
-
Overhead Utilities
-
Permit Required
-
Confined Space
-
Night Work
-
Hot Work
-
Fire Hazards (Check All That Apply)
-
Combustible Materials
-
Fuel/Gas Containers
-
Other
-
List
Health Hazards (Check All That Apply)
-
Heat Stress
-
Cold Stress
-
High Noise (<85 dBA)
-
Silica Exposure (Concrete Cutting)
-
Lifting Hazards
-
Chemical Exposure
-
EME/RF
-
Other
-
List
Hazard Control Measures
PPE/Monitoring Equipment (Check All That Apply)
-
Hard Hats
-
Safety Glasses
-
Hearing
-
Fall Protection
-
RF Suits
-
RF Monitors
-
Face Shields
-
Apron
-
High Viz Vest/Clothing
-
Safety Toed Shoes
-
Electrical Gloves
-
Insulated Tools
-
Gloves (i.e. leather, mechanical, cut resistant)
-
Other
-
List
-
Notify your HSE Manager before entering a trench/excavation that is great than 5' deep
-
Notify your HSE Manager before entering a Permit Required Confined Space
-
Notify your HSE Manager prior to performing night work (periods of darkness change with the seasons)
Inspections Completed (Check All That Apply)
-
Tools/Equipment
-
Housekeeping
-
Ground Fault Protection
-
Hoists
-
PPE
-
Ladders
-
Rigging
-
Tag Lines
-
Gin Poles
-
Ropes
-
PFAS
-
Other
-
List
-
Notify your HSE Manager before entering a trench/excavation that is greater than 5' deep
-
Notify your HSE Manager before entering a Permit Required Confined Space
-
Notify your HSE Manager prior to performing night work (periods of darkness change with the seasons)
Safety Program/Training (Check All that Apply)
-
Tailgate Meeting Conducted?
-
Site Signage Conspicuously Posted?
-
Lockout/Tagout Performed?
-
Excavation Log Completed?
-
Permit System Completed? (Hoisting Personnel)
-
Notify your Health and Safety Manager before entering a trench/excavation that is greater than 5' deep.
-
Notify your Health and Safety Manager before entering a Permit Required Confined Space
-
Notify your Health and Safety Manager before performing night work (periods of darkness change with the seasons)
Tasks To Be Performed
-
Task 1
-
Task 2
-
Task 3
-
Task 4
-
Task 5
-
Task 6
-
Task 7
-
Task 8
-
Task 9
-
Task 10
Identified Hazards
-
Hazard 1
-
Hazard 2
-
Hazard 3
-
Hazard 4
-
Hazard 5
-
Hazard 6
-
Hazard 7
-
Hazard 8
-
Hazard 9
-
Hazard 10
Hazard Controls
-
Control 1
-
Control 2
-
Control 3
-
Control 4
-
Control 5
-
Control 6
-
Control 7
-
Control 8
-
Control 9
-
Control 10
RF Safety Plan
-
Other
General RF Site Requirements
-
All employees or subcontractors entering into an environment that meets the criteria of the FCC/OET Bulletin 65, as a Controlled Environment, must adhere to the following requirements:
-
All personnel must have annual RF site safety awareness training
-
All personnel must be able to read and understand RF site signage
-
All personnel must have authorized access to the RF site
-
Personnel must have means of determining Maximum Permissible Exposure (MPE) levels at each work location
-
Personnel must monitor MPE level requirements of the OET Bulletin 65 and other transmitting frequencies they may be exposed to
Site Specific RF Requirements
-
MPE Data will be determined by the use of an RF monitor
-
If MPE readings are 100% or above, all personnel must remove themselves from the RF field and contact their safety representative for further guidance
-
S/N:
-
MPE %:
-
S/N:
-
MPE %:
-
Maximum MPE level recorded at work location?
Controlling Methods for Limiting RF Exposure (Check All That Apply)
-
Reduce power levels of transmitting antenna
-
Full removal of power from transmitting antenna/sector
-
Administer Lock-out/Tag-out procedures
-
Personnel Protective Equipment (RF Suit)
-
Other
-
Explain
Complete for Tower Work (Fall Protection & Hoisting Personnel)
-
Type of Tower/Rooftop
-
Type of Equipment Mount
-
Fall Protection to Be Used (Check All That Apply)
-
Full Body Harness
-
Double Leg or Two Lanyards
-
Rope Grab
-
Cable Grab
-
Retractable Lifeline
-
Anchorage Straps
-
Ropes
-
Descenders
-
Other
-
Type
-
1. Has each employee inspected his or her fall protection equipment?
-
2. Describe the fall protection system to be used when accessing antenna booms or performing tower erection:
-
Hoisting Equipment to Be Used (Check All That Apply)
-
Personnel Platform/Manbasket
-
Crane/Boom Truck
-
Capstan Hoist
-
Gin Pole
-
Winch
-
Other
-
Explain
Review and Signatures
Onsite Personnel
-
Name
-
Name
-
Name
-
Name
-
Name
-
Name
-
Name
-
Name
-
Name
-
Name