Title Page
-
Client
-
Store Name
-
Store Number
-
Contractor Completing Audit
- Space
- TRS
- Blue Cooling
- Clade
- Carters
- KB
- EPTA Uk
-
Date Completed
On site checklist
Equipment Checklist Nitrogen
-
Nitrogen purging to produce an oxygen free environment is required prior to brazing commencing. Please see attached process
-
Sufficient quantity of OFN on site
-
How many bottles are on site?
-
Please see description/photo of approved regulator type - Uniweld UNF3 Nitrogen Flow Indicator with 1/4-Inch Female Flare Inlet Connection and 1/4-Inch Male Flare Outlet Connection
-
Approved type of pressure regulator on site?
-
Brazing rod for copper/copper joints silver content (minimum 5%)
-
Please stated exact silver content from batch details
-
Flashback arresters for both lines
-
All relative PPE for task
Installation Team
-
City & Guilds is an approved qualification, but should be for new engineers. BRA level 3 is required for all other operatives, as re-testing every 3 years is required as per BRA document (jointing of copper pipework for refrigeration systems). An 18-month grace period is in place for retraining to take place. BRA document also stipulates that anyone who has not been brazing for a period greater than six months should be retested. Any qualifications listed under Other would need approval by client.
-
Number of pipe fitters brazing?
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- N/A
-
Number of sub contract pipe fitters brazing?
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- N/A
-
Operative 1 Name
-
Operative 1 Qualification
-
Please list qualification?
-
Operative 2 Name
-
Operative 2 Qualification
-
Please list qualifications?
-
Operative 3 Name
-
Operative 3 qualification
-
Please list qualifications?
-
Operative 4 Name
-
Operative 4 qualifications
-
Please list qualifications?
-
Operative 5 Name
-
Operative 5 Qualification
-
Please list qualifications?
-
Operative 6 Name
-
Operative 6 Qualification
-
Please list qualification?
-
Operative 7 Name
-
Operative 7 Qualification
-
Please list qualifications?
-
Operative 8 Name
-
Operative 8 Qualification
-
Please list qualifications?
-
ADDITIONAL INFORMATION - Brazing operatives
Equipment setup
-
Select brazing gases
-
Are you using flux on copper/copper joints
-
What type? Please detail
-
Nozzle type being deployed
-
What size nozzle is be deployed?
- 13
- 14
- 15
- 16
- 17
- Other
-
Please specify
Notes - any additional items that you feel should be highlighted
-
Free Text Area
Sign off Required
-
Please answer all questions where applicable. The person signing off this document is agreeing all brazing and purging processes and procedures have been followed, in line with all information given within this document including attachments and against BRA - Jointing of copper pipework for refrigeration systems .
-
Position held of person completing sign off
- Pipe fitter
- Lead pipe fitter
- Site supervisor
- Project manager
- Other
- Installation supervisor
- Installation manager
-
Please specify position held?
-
Add signature
-
Select date